South Bend Redevelopment Commission <br /> Regular Meeting—September 27, 2011 <br /> 6. NEW BUSINESS (CONT.) <br /> B. South Bend Central Development Area <br /> (2) continued... <br /> lighting; and patch and paint the existing <br /> columns and canopy. The fee for design of <br /> the west entry improvements is $16,000. <br /> Once design features and construction <br /> estimates are completed, it is expected <br /> project funding will be presented to the <br /> Commission for consideration. Funding for <br /> this project will be supplemented with <br /> $150,000 the Hotel-Motel Tax Board has <br /> approved for 2012 for the west entry point <br /> improvements. <br /> Staff requests approval of these proposals <br /> from ADG, in a not-to-exceed amount of <br /> $23,000 ($7,000 for the south entry point, <br /> and $16,000 for the west entry point). <br /> Mr. Downes asked what the construction cost <br /> is estimated to be for the project. Mr. Relos <br /> replied that the west entry point is estimated <br /> at $200,000 of which $150,000 will be <br /> supplemented with the Hotel-Motel Tax <br /> Board. Mr. Lamie noted that estimates had <br /> been done for replacements of the doors. <br /> The same contractor who replaced the south <br /> entry doors provided a quote for the west, at <br /> a little over $200,000. <br /> Mr. Downes asked about the total amount. <br /> Mr. Lamie said that an initial analysis was <br /> done of the problem areas months ago as the <br /> Building and Grounds Committee was <br /> putting together its capital plan. <br /> Mr. Relos added that the south entry design <br /> 7 <br />