My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-27-11 Redevelopment Commission Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2010-2019
>
2011
>
09-27-11 Redevelopment Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2011 8:32:34 AM
Creation date
10/12/2011 8:32:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br /> Regular Meeting—September 27, 2011 <br /> 6. NEW BUSINESS (CONT.) <br /> B. South Bend Central Development Area <br /> (1) continued... <br /> the amount of$13,250. (117 E. <br /> Wayne/Vesuvio's Pizza) <br /> (2) Proposal for design work for Century <br /> Center southern and western entries. <br /> Mr. Relos noted that in an effort to further <br /> enhance the beauty and character of Century <br /> Center, the southern entry where patrons <br /> enter from the parking lot, and the western <br /> main entrance off St. Joseph St. are in need <br /> of improvements. Architectural Design <br /> Group (ADG) has been very involved with <br /> design and construction oversight of many of <br /> Century Center's recent improvements, and <br /> is familiar with this city asset. <br /> This proposal is for design work to arrive at a <br /> cost estimate for the south entry <br /> improvements. Improvements under <br /> consideration for this entry point are: a new <br /> parking attendant booth and its concrete <br /> island; pedestrian safety dividers; limited <br /> vehicle entry points into and out of the <br /> parking lot for vehicular and pedestrian <br /> safety; new planters, landscaping, lighting, <br /> curbs, and entry walkway pavement. The <br /> total cost for design of this entry point is <br /> $7,000. <br /> The proposal for the west entry is for design, <br /> construction documentation, and assistance <br /> with the bidding and construction phases. <br /> Improvements under consideration for this <br /> entry point are: removal and installation of <br /> new entry doors; entry walkway pavement; <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.