My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005 Performance Based Budget
sbend
>
Public
>
Finance
>
Budgets
>
2005
>
2005 Performance Based Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2014 10:58:01 AM
Creation date
12/19/2007 1:34:00 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
522
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
annexations and overall growth within the City which cannot be accurately projected at this time, <br />Future revenue can. also be impacted by any rate change that may be enacted beyond 2005. Rate <br />increases or decreases are determined on a case by case basis and can be impacted by either <br />capital needs or funding of ongoing operational expenses. <br />The South Bend Water Works received approval from the Indiana Utility Regulatory <br />Commission to increase its water utility rates and charges effective December 2005. The average <br />water rate increase was approximately 15% over the prior rate. Although this sounds significant, <br />the City of South Bend remained in the lower percentile in regards to water rates charged by <br />other municipalities throughout Indiana. After the rate increase, South Bend's water rates ranked <br />sixth lowest out of the twenty largest cities in Indiana. It had previously ranked fourth lowest <br />prior to this 1 S% increase. The City is in the very early stages of determining if a future rate <br />increase will be needed to cover the growing operations and maintenance costs anticipated in the <br />years 2006 and beyond. <br />In January 2003, a Sewer rate increase was enacted for 2003 and 2004, the first in 15 years. The <br />overall revenue enhancement with the rate increase is 24 percent. The City engaged independent <br />consultants in 2002 to perform a Cost of Service Study which adjusted fixed vs variable costs <br />and other allocations. These rates are intended to be revised with new rates effective in 2005 to <br />assure that the municipal sewer system has sufficient revenue. The City's sewer rates ranked <br />right in the middle of the nineteen largest cities in Indiana as of year-end 2000, while its <br />combined sewer and water rates ranked fourth lowest in the state. With this rate increase, the <br />City's sewer rates remain in the middle of the nineteen largest cities. <br />This increase in rates was requested in light of the need to issue Sewer revenue bonds totaling <br />$21.3 million for capital improvements over five years. The purpose of issuing this debt is to <br />finance the cost of necessary capital additions, improvements and extensions to the City's <br />municipal sewer and wastewater infrastructure. These capital expenditures are necessary to <br />enhance present and future needs and to maintain the highest level of quality and quantity <br />acceptable for the community. The bond that will be issued is for capital needs only -not for <br />operations or maintenance. <br />In late 1998, the County's Solid Waste Management District enacted a mandatory recycling <br />program for all county residents. This program is expected to have a significantly positive <br />impact on the City's future landfill costs. As a result of the anticipated cost savings resulting <br />from City residents' participation in this countywide recycling program, a rate increase may now <br />be delayed for an undetermined amount of time. Results of the recycling program will be <br />reviewed prior to any final determination of future solid waste pick-up fees. <br />As mentioned earlier, the City is always looking for other sources of revenue that would reduce <br />its reliance on property taxes. A viable source of revenue is from user fees andlor charges for <br />services currently being performed. The City has included in its 2005 budget $12.1 million of <br />revenue from user fees that are currently in place. It is the City's desire to establish all user <br />charges and fees at a level closely related to the full cost of providing the services while taking <br />into consideration similar chargeslfees being levied by other public and private providers. The <br />City recalculates, on an annual basis, the full costs of activities supported by user fees (including <br />the Parks Department, EMS ambulance services, Building Department and the Century Center <br />among others) to identify the impact of inflation and other cost increases. It then revises user <br />fees accordingly. As a result, overall charges for services and user fee revenues are anticipated to <br />B-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.