Laserfiche WebLink
DLZ <br />ENGINEERS • ARCHITECTS • SCIENTISTS <br />PLANNERS • SURVEYORS <br />September 29, 2011 <br />City of South Bend <br />Board of Public Works <br />227 West Jefferson Boulevard <br />South Bend, Indiana 46601 <br />RE: Professional Consulting Services Letter Agreement <br />Evaluation of Emergency Response Time Frame for Proposed Fire Station Sites 5 and 9 <br />Gentlemen: <br />DLZ Indiana, LLC (DLZ) is pleased to respond to your request for professional consulting services and <br />submit this letter agreement for your consideration. <br />DESCRIPTION <br />The City of South Bend (City) is considering two new fire station sites to serve District No. 9 at 921 <br />Louise Street and District No. 5 at 2610 Prairie Avenue. The following scope of services will evaluate <br />percent of coverage by the first responding units serving Fire Districts 5 and 9, and will make <br />comparisons between the current and proposed stationhouse locations. <br />We understand the South Bend Fire Department (SBFD) fire district boundaries have been updated since <br />the 2004 South Bend Fire District Study and Plan Update (2004 District Study) was prepared. Therefore, <br />we propose that the current SBFD District Boundary Map be used for this evaluation. Also, as part of this <br />evaluation the recommendations made in the 2004 District Study concerning Districts 5 and 9 will be <br />reviewed and summarized. <br />SCOPE OF BASIC SERVICES <br />1. Meet with designated City and SBFD personnel to obtain updates of the following information: <br />• Changes to city limits adjacent to the subject districts. <br />• Digital copy of the fire district boundary maps currently in effect. <br />2. Create District 5 and District 9 base map for use during this evaluation. <br />3. Summarize evaluations and recommendations made in the 2004 District Study concerning Fire <br />Districts 5 and 9. <br />4. Map incremental response limits for engine /rescue at both existing and new stationhouse locations by <br />travel time. The mapping will be performed using times that are consistent with NFPA 1710 <br />guidelines and will be performed, in part, by linear network analysis of roadway centerlines from a <br />central origin point and expanded outwardly at specified distances within the subject fire districts. <br />5. Tabulate the percentage coverage for Districts 5 and 9 serviced by the first response units from both <br />existing and new locations in accordance with NFPA 1710 guidelines. <br />Note, the mapping and evaluation of the percentage of coverage overlap from adjoining fire district <br />will not be conducted under these basic services. <br />2211 East Jefferson Blvd. • South Bend, Indiana 46615 • (574) 236 -4400 • FAX (574) 236 -4471 <br />With Offices Throughout The Midwest <br />www.dlz.com <br />