Laserfiche WebLink
Portage Prairie Planned Unit Development <br />February 9, 2005 <br />(1) Sidewalks or trails shall be required along all new streets developed within <br />the Portage Prairie Planned Unit Development as follows: <br />(a) Residential Areas - on both sides of all streets. <br />(b) Retails Areas - on both sides of all streets. <br />(c) Industrial Areas - on one side of all streets. <br />(d) Research and Development - on one side of all streets. <br />(e) Office /Medical - on one side of all streets. <br />(f) Office /Flex - on one side of all streets. <br />(2) Walkways -Continuous internal walkways shall be provided from <br />sidewalks to the principal entrances of all buildings. <br />(3) Overall Trails: <br />In addition to the sidewalks or trails and walkways outlined above, an <br />overall trail system shall be planned and developed that will provide <br />functional connections from all residential areas to all neighborhood retail <br />areas and employment areas within the Portage Prairie Planned Unit <br />Development. In addition, the overall trail system shall be designed to <br />provide for extensions to other trails or greenways developed or planned by <br />the City of South Bend or St. Joseph County. <br />(a) Overall Trail System Design - A filing requirement for the first <br />primary plat for any development within one of the Areas (A, B, C <br />or D) of the Portage Prairie Planned Unit Development shall be an <br />Overall Trail System Map for that Area of the Portage Prairie <br />Planned Unit Development. The Overall Trail System Map for each <br />Area shall also indicate proposed connections to the other Areas of <br />Portage Prairie. <br />(b) Initial Phase -The first primary plat shall indicate the <br />implementation of the initial phase of the Overall Trail System in <br />connection with secondary plat approval. <br />(c) Subsequent Phases - An updated Overall Trail System Map shall be <br />filed with each subsequent primary plat which shall indicate those <br />portion of the trail system implemented in prior sections and <br />updating the location and amenities associated with the trail which <br />remains to be constructed. <br />6 <br />INIMAN2 902256v5 <br />