<br />SPECIAL MEETING NOVEMEER 29 2007
<br />
<br />®o ~. ~ i
<br />----
<br />
<br />disposal of $000-10000 gallon undergro d storage tank systei~i I
<br />U011 as defined in Section 020$0. Tai~lc
<br /> Excavation, waste characterization, removal, transportation, and ~5,~: I~
<br /> disposal of 12000 gallon in~iderground storage tai~l~ system as '~
<br />U012 defined in Section 020$0. Tarn.{
<br /> Excavation, waste characterrzation, rei~ioval, transportation, and
<br /> disposal of 20000 gallon underground storage tank system as
<br />U013 defined in Section 020$0. Tank X6,2 i .;_ _
<br /> placing/pui~iping Towable ~acl~fill in abandoned sewer piping, Cu.
<br />U014 manhole vaults, strLictures, and pits. Yd ~ $2.00 -
<br /> Eaclcfill and/or Fill obtained, transported, placed, graded, and
<br /> compacted From off-site source in accordance with the
<br />U015 recluireixiei~ts set forth in Section 02300. Ton ~ _12.00
<br /> Lurnp
<br />U016 St. ~ose~h County Jail Air Filter Allowance Sui~i~ ~ 7,000.00
<br />2625 South Loomis
<br />Chicago, Illinois 6060$
<br />I3id was signed by: Mr. Robert M. Stevenson
<br />Non-Collusion Affidavit was in order
<br />Non-Discrimination commitment fo was completed
<br />Five Ten percent (5~/0) did Bond was submitted
<br />13ID: X9,535,460.00
<br />~'lC' l~~® DESCRIpTICN ~
<br /> C.'~ "~ ;
<br /> p~'T ~ q- -
<br /> ~.'~ _;) _
<br />I3~01 Mobilization/Demobilization ~ 34,$43.00 i
<br />E1302 project planning ~ Work pl (s) Development ~ 2,000.00
<br />EE03 Above-Grade wilding Dei~iolition $ 31$,071.00 _
<br />I~~04 Eelow-Grade Demolition X1,000,777.00
<br />---
<br />I3EOS Euildnlg Material Rubble Reixioval/Disposal .`6 172,961.00
<br />E~06 Site Debris Remova emolition ~ $,459.00
<br />1307 Const coon ~ Storm Water RemovaUDisposal, ~ 3 $2,624.00 >~
<br /> Including Dewatering ~ pretreatment --
<br />13E0$ Friable Asbestos Contai g Materials `~ 302,500.00
<br /> (including materials witl ~ the tunnels, pits,
<br /> vaults, chases, and buried)
<br />E~09 Non-Friable Asbestos Containing Materials `6 636,900.00
<br /> (including rnatenals witl ' ~ the tunnels, pits,
<br /> vaults, chases, and b 'ed}
<br />~E10 hazardous Waste Removal ~ Disposal (within ~ u1vt~' SATE
<br /> the building's footprints ~ on or above the P~~P~R ~N~t-~~'t~~t,
<br /> buildings lowest Floor slab) N~E~~~
<br />E~ 11 Containinatcd Waste Removal c~ II:?isposal ~ UNk`t' iZA`t'~
<br /> (within the buildings' footprints ~ on of above ~R~~~~ ~1~AL,Y~'t~~t,
<br /> the buildings' lowest floor slab) ~~'~~~~
<br />EE12 Universal Waste Reixioval ~ Disposal ~ 107,2$$.00
<br />-
<br />E1313 pC~ Waste Removal ~ Disposal (within the ~ 47,615.00 ~
<br /> buildings' footprints ~ on or above the Subject to proper
<br /> buildings' lowest Floor slab) an~.ly~:ic,al results
<br />I~~14 Site Restoration, Including Fencing, Seedn~g ~ `~ X23,544.00
<br /> ether Fill Materials
<br />13E15 Underground Utility Costs, Include the ~ 306,261.00
<br />
|