Laserfiche WebLink
~ Ate. ~ <br />~.d v C.~ <br />SPECIAL MEETING NOVEMEER 29 2007 <br /> <br />®o ~. ~ i <br />---- <br /> <br />disposal of $000-10000 gallon undergro d storage tank systei~i I <br />U011 as defined in Section 020$0. Tai~lc <br /> Excavation, waste characterization, removal, transportation, and ~5,~: I~ <br /> disposal of 12000 gallon in~iderground storage tai~l~ system as '~ <br />U012 defined in Section 020$0. Tarn.{ <br /> Excavation, waste characterrzation, rei~ioval, transportation, and <br /> disposal of 20000 gallon underground storage tank system as <br />U013 defined in Section 020$0. Tank X6,2 i .;_ _ <br /> placing/pui~iping Towable ~acl~fill in abandoned sewer piping, Cu. <br />U014 manhole vaults, strLictures, and pits. Yd ~ $2.00 - <br /> Eaclcfill and/or Fill obtained, transported, placed, graded, and <br /> compacted From off-site source in accordance with the <br />U015 recluireixiei~ts set forth in Section 02300. Ton ~ _12.00 <br /> Lurnp <br />U016 St. ~ose~h County Jail Air Filter Allowance Sui~i~ ~ 7,000.00 <br />2625 South Loomis <br />Chicago, Illinois 6060$ <br />I3id was signed by: Mr. Robert M. Stevenson <br />Non-Collusion Affidavit was in order <br />Non-Discrimination commitment fo was completed <br />Five Ten percent (5~/0) did Bond was submitted <br />13ID: X9,535,460.00 <br />~'lC' l~~® DESCRIpTICN ~ <br /> C.'~ "~ ; <br /> p~'T ~ q- - <br /> ~.'~ _;) _ <br />I3~01 Mobilization/Demobilization ~ 34,$43.00 i <br />E1302 project planning ~ Work pl (s) Development ~ 2,000.00 <br />EE03 Above-Grade wilding Dei~iolition $ 31$,071.00 _ <br />I~~04 Eelow-Grade Demolition X1,000,777.00 <br />--- <br />I3EOS Euildnlg Material Rubble Reixioval/Disposal .`6 172,961.00 <br />E~06 Site Debris Remova emolition ~ $,459.00 <br />1307 Const coon ~ Storm Water RemovaUDisposal, ~ 3 $2,624.00 >~ <br /> Including Dewatering ~ pretreatment -- <br />13E0$ Friable Asbestos Contai g Materials `~ 302,500.00 <br /> (including materials witl ~ the tunnels, pits, <br /> vaults, chases, and buried) <br />E~09 Non-Friable Asbestos Containing Materials `6 636,900.00 <br /> (including rnatenals witl ' ~ the tunnels, pits, <br /> vaults, chases, and b 'ed} <br />~E10 hazardous Waste Removal ~ Disposal (within ~ u1vt~' SATE <br /> the building's footprints ~ on or above the P~~P~R ~N~t-~~'t~~t, <br /> buildings lowest Floor slab) N~E~~~ <br />E~ 11 Containinatcd Waste Removal c~ II:?isposal ~ UNk`t' iZA`t'~ <br /> (within the buildings' footprints ~ on of above ~R~~~~ ~1~AL,Y~'t~~t, <br /> the buildings' lowest floor slab) ~~'~~~~ <br />EE12 Universal Waste Reixioval ~ Disposal ~ 107,2$$.00 <br />- <br />E1313 pC~ Waste Removal ~ Disposal (within the ~ 47,615.00 ~ <br /> buildings' footprints ~ on or above the Subject to proper <br /> buildings' lowest Floor slab) an~.ly~:ic,al results <br />I~~14 Site Restoration, Including Fencing, Seedn~g ~ `~ X23,544.00 <br /> ether Fill Materials <br />13E15 Underground Utility Costs, Include the ~ 306,261.00 <br />