SPECI~L,IVIEETII~G Im1O~1E1~I13ER 29, 2007
<br />_- ~ {, _:y
<br />0.~ i_:
<br /> Pretreatment
<br />E~08 Friable Asbestos Colataining Ii4aterials $ 429,000.00
<br /> (including rnaterials within the tr els, pits,
<br />
<br />-- vaults, chases, and b 'ed)
<br />13I309 l~o1a-I~riable Asbestos Containing l~laterials $ 106,600.00
<br /> (including materials within the tunnels, pits,
<br /> vaults, chases, and bL~ried)
<br />EI310 Plazardous Taste Rerrloval ~ Disposal (within $ 117,160.00
<br /> the building's footprints ~ on or above the
<br /> buildings lowest fl®or slab)
<br />~~ 1 l Cont mated waste Removal ~ Disposal $ 100,000.00
<br /> (within the buildings' footprints ~; on or above
<br /> the bulldings' lowest floor slab)
<br />~ 12 Universal waste IZenaoval ~ Disposal $ 54,070.00
<br />83 PCE Waste Rcrnoval ~ Disposal (within the $ 57,910.00
<br /> buildings' footprints ~ on or above the
<br />
<br />-- buildings' lowest floor slab)
<br />~II~14 Site Restoration, Including :Fencing, Seeding $1,688,000.00
<br />
<br />-- Other F'Ill l~laterlals
<br />~~ 15 Uladcrgro d Utility Costs, Include the $ 115,115.00
<br />j Capping/dosing of Existing Utilities to be
<br /> lib doned ~z Proposed Utility Costs
<br />DE16 Site Excavation and Stockpiling $1,836,700.00
<br />EE17 Below Grade T el Rernoval d Disposal. $ 150,000.00
<br />I~I~18 Soft Costs for ~ondilag, Insurance ~ Project $ 185,850.00
<br />j Admi `stration
<br />fII319 Pernllt/cove ent Regtidatlon Compliance $ 30,000.00
<br /> Costs, including bait not liiaaited to IDEI~I ~ City
<br />
<br />- Utilities
<br />1~~20 Cost ®f Allowances $2,530,055.00
<br />_ Refer to Section 01102
<br />13E21 Irnplementatlola of ~Ialnten ce of ~ raffic Plata $ 105,®00.00
<br />I~~22 Elavlronl~icntal Contingelacy Costs $ 60,000.00
<br />I~E23 Enviro ental Testing Site Monitoring $ 216,500.00
<br />_ ~I~24 Security, Odor, DLISt ~ Noise Control $ 80,000.00
<br />E~25 Maintenance of Traffic $ 30,200.00
<br />
<br />~
<br />-- 1T
<br /> Excavation, waste characterization, tr sportation, and disposal of $ 54.10
<br />~ ~L7001
<br />~ -- eont ilaated soils, as defined in Section 02080. Ton
<br /> Excavation, waste characterization, transportation, and disposal of $ 450.00
<br />~T002 sods classified as a "hazardous waste" m Section 02080. Ton
<br />r~ Wastc characterization, transportation, and disposal of $ 25.00
<br />U003 Unsatisfactory `T'ype I Soils, as defined in Sectiola 02300. Ton
<br /> Waste characterization, transportation, and disposal of $ 54.10
<br />~ '~T004 Unsatisfactory Type II Soils, as defilaed in Section 02300. Ton
<br /> Disposal of contaminated concrete waste as defined in Section $ 54.10
<br />T005 02080. To1a
<br />U006 Disposal of hazardous concrete waste as defined iia Section 02080 Ton $ 450.00
<br /> Pumping, waste characterization, transportation, and disposal of $ 0.88
<br />'i~007 non-hazardous liquids Gallon
<br /> Pumping, waste characterization, transportation, and disposal of $ 2.50
<br />U008 hazardous liquids Gallon
<br />_ Excavation, waste characterization, removal, transportation, and $3,470.00
<br /> disposal of 250-3000 gallon iandergrotind storage tank system as
<br />U009 defined in Section 02080. Tank
<br /> Excavations, waste characterization, removal, transportation, and $4,345.00
<br /> disposal of 4000-6000 gallon underground storage tank system as
<br />I T010 defined in Section 02080. Tank
<br /> Excavation, waste characterizationl, removal, transportation, and $5,®50.00
<br />
|