My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-03-06 Redevelopment Commission Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2000-2009
>
2006
>
02-03-06 Redevelopment Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2007 1:28:48 PM
Creation date
12/11/2007 4:34:47 PM
Metadata
Fields
Template:
General
Date
2/3/2006
Document Relationships
02-03-06 Agenda
(Superseded by)
Path:
\Public\Redevelopment Commission\Agendas & Packets\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting -February 3, 2006 <br />4. COMMUNICATIONS <br />() continued... <br />and the community, plus all the artists and their <br />friends. Everyone turned up again to paint the <br />inside. Many hands make light work, and the <br />potluck made it all fun. <br />We had no budget for labor, so Fire Artists <br />worked on the building two evenings a week <br />(after their day jobs) plus many weekends for <br />eleven months. Finally, in April 2005, we <br />declared the building finished and had a <br />celebratory dinner. There were still <br />improvements needed, but at last all the areas <br />were set up and it was possible to create artwork <br />from start to finish. We had worked very hard <br />indeed. <br />First the roof had been patched, basic plumbing <br />pipes replaced, and the electricity turned on. <br />This made us secure, and we could plug in our <br />tools. <br />It took two days but the gas service crew was able <br />to locate and fix all the small leaks so we could <br />pass the pressure test and have the gas turned on. <br />Only then were we able to check out each of the <br />furnaces and have them repaired, one at a tine, <br />as money became available. Our artists worked <br />the first winter in their winter coats. Now, during <br />our second winter, we are comfortable. <br />We added two utility sinks (one for sculptors and <br />one for potters) and a handicap accessible <br />bathroom-complete with a Blodgett wall mural! <br />Electric service was increased to accommodate <br />all or power tools. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.