My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B (6)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
08-09-11 Packet
>
6B (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:02:36 PM
Creation date
8/5/2011 11:32:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COSB — Bill Schalliol <br />August 4, 2011 <br />Page 3 of 4 <br />PROFESSIONAL. FEES <br />The estimated fees to provide the tasks outlined are as follows: <br />Task 1— Shillings Building Architectural Services $3,515.00 <br />Task 2 — Richey's Radiator and Harmon Glass Site Improvements $5,225.00 <br />Task 3 — Coveleski Renovation Construction Administration $75,225.00 <br />$83,965.00 <br />The total cost of professional services for the Part -Time Inspection will be conducted on a lump sum <br />basis and shall not exceed the sum of $83,965.00. <br />Should you have any questions, please do not hesitate to contact me at 574 - 232 -4388. <br />Sincerely, <br />David M. Rafinski <br />Vice President <br />I:1ProposaWity of South Bend[CoveteW StediumlSite Inspection <br />ServicesiCoveleski Site Inspedion 84- 11.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.