Laserfiche WebLink
COSB — Bill Schalliol <br />August 4, 2011 <br />Page 2 of 4 <br />Task 2 — Richey's Radiator and Hannon Glass Site Improvements <br />• Provide to the City site designs for the existing Richey's Radiator property that <br />includes, but is not limited to, removal of existing curb cuts, parking <br />reconfiguration and the location of a decorative column which will be similar to <br />those installed at the intersection of Lafayette Boulevard and Western Avenue. <br />• Provide a site layout for a decorative column to be located on the existing <br />Harmon Glass property. The layout for this column shall include an easement. It <br />is our understanding that conceptual plans have been prepared for the <br />renovation of the existing building and this design should be considered when <br />locating the proposed column. <br />• New curb ramps at the southern corners of Western Avenue and William Street <br />will be provided. <br />• Construction documents and specifications will be prepared for the above listed <br />site improvements for bidding purposes. <br />Task 3 — Coveleski Renovation Construction Administration <br />• Daily reviews of site construction will be completed to ensure the contractor(s) is <br />providing the level of quality that is required for the project; <br />• Based upon the on -site observations and evaluations of the contractor's <br />Applications for Payment, assistance to the City will be provided to determine the <br />amounts due to the contractor; <br />• Wightman Petrie will provide clarification/interpretations of the Contract <br />Documents if such interpretations are necessary for the proper execution or <br />progress of work; <br />• Wightman Petrie shall render written recommendations on claims, disputes and <br />other matters in question between the owner and contractor relating to the <br />execution or progress of the project as provided by the Contract Documents; <br />• Review and approve, or take other appropriate action and forward to the City for <br />final disposition, the contractor's submittals such as Shop Drawings, Product <br />Data and Samples with respect to Contract Documents produced by Wightman <br />Petrie; <br />• Prepare responses to Request for Information (RFI) provided by the contractor; <br />• Prepare Change Orders for the owner's approval and execution; <br />• Provide field reports describing observations, problems and recommended <br />solutions; <br />• Provide punch lists based on site observations; <br />• Conduct inspections to determine the date or dates of Substantial Completion <br />and the date of Final Completion; <br />• Review and approve, or take other appropriate action on, the contractor's list of <br />items to be completed or corrected. <br />