Laserfiche WebLink
the full report be attached to the minutes. <br />Studebaker /Oliver <br />— Acquired Oliver Plow Works, March 2002 <br />(999,999 sft.). <br />— Acquired South Bend Stamping Plant, <br />March 2002 (1,370,000 sft.). <br />— Completed first phase of Oliver <br />demolition. <br />— Awarded second phase of Oliver <br />demolition. Work to be completed by July <br />2003. <br />Sample -Ewing Development Area <br />— $48.7 million in investment in the SEDA. <br />— All aspects of the TJX project including <br />land acquisition, disposition, site preparation <br />and building construction are all completed <br />or underway. <br />— Rehab of the Wenger Homestead is <br />completed. <br />— Five American Home Dreams completed <br />ILand two currently under construction. <br />Aimort Economic Development Area <br />— $20 million in investment in the AEDA. <br />— 547,000 sft of new construction. <br />— Tech Data currently under construction <br />(325,000 sft). <br />— Bosch Phase I and lI, a $7.4 million <br />project, has been completed. <br />South Bend Central Development Area <br />— $19.5 million in investment in the <br />SBCDA. <br />— Completion of Environmental Health Labs <br />new building. <br />— Completed MOU and Development <br />Agreement with Memorial Hospital for <br />future expansion. <br />Other <br />— Designation of South Side Development <br />19 <br />