Laserfiche WebLink
South Bend Redevelopment Commission <br />Regular Meeting — October 19, 2007 <br />3. APPROVAL OF Cl -,AIMS CO T, <br />AT & T 27.05 <br />Downtown South Bend, Inc. 465062.50 <br />422 FUND WEST WASHINGTON <br />CFH Landscape Services 120.00 <br />426 FUND MEDICAL D S T RI C T T IF <br />DLZ 551200.00 <br />428 FUND AIRPORT 2003 BON <br />1 &'R Excavating 613,945.04 Voordc D ve Extensioll <br />Selge Constraction Co. .1nc. 268,977,71 Olive Road Reconstr Uctio <br />430 FUND SOUTH SIDE DEVELOPMENT <br />CF'H.. Landscape Service 210.00 <br />1,105,3.4 <br />Total I X05,3 2.48 <br />Mr. Pecz o sl i asked for the breakdown down o the DTSB <br />claim. Mr. Inks gave him a copy of the claim. Mr. links <br />also noted that based on review at previous Come issioll <br />meetings, staff did send a letter to DTSB and committed <br />to doing a walk through ugh f the downtown with DTSB in <br />conjuiicfto.n with their next claim. Mr. Inks and Mr. <br />Mariani did that walkthrough and reviewed the work <br />that had been requested. <br />Mr. Peczkowski said that he noticed that the last of the <br />shortcomings lie had photographed were completed just <br />last week. However, the litter patrol seems to still <br />inadequate. The litter that had been in the area ofMain <br />and LaSalle for three months was cleaned up, but after <br />that there is litter that has been in other containers for <br />three weeks. He thiiiks the organization is being <br />overpaid for very little work. <br />Mr. Downes made a motion to approve the Claims <br />submitted October 19., 2007. Mr. King seconded the <br />motion. The vote was four to one with Mr. Peczkowski <br />opposed. The motion carried. <br />3 <br />OM M I [ON A PP I M ED THE CLA IM S <br />SUBMIFI'TE -1) OCTOBER 19, 20071 AND ORDERED <br />E <br />THE CHECKSTO BE RELEASED <br />