My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-17-07 Redevelopment Commission Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2000-2009
>
2007
>
08-17-07 Redevelopment Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 11:20:12 AM
Creation date
12/11/2007 3:34:32 PM
Metadata
Fields
Template:
General
Date
8/17/2007
Document Relationships
08-17-07 Redevelopment Commission Agenda
(Superseded by)
Path:
\Public\Redevelopment Commission\Agendas & Packets\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend I ede elopni.ent Commission <br />Regular Meeting — August , 2007 <br />6. NEW BUSINESS (CONY.) <br />D. South Side Development Area <br />(1) continued. <br />Mr. Peezkowsk.l. asked what was paid for <br />4209, 430 au-id 4323. Mr. Inks responded <br />that that inforn'lation was not brought to the <br />meeting. Staff can provide it later. <br />His point 1s that when the Commission first <br />saw this proposal it. Included. clause one <br />where they wish to trade $65,500 for <br />demolition services. Now all of a sudd-e n <br />there's other property thrown in. How much <br />of these five lots .is Caroline Partners getting? <br />It looks like they are close to having a <br />monopoly on that area from Mctalmation. to <br />Ireland -load. Mr. Witwer responded that he <br />doesn't have a map of the proposed <br />'Main/Lafayette crossover. A substantial <br />a count of those properties will. be used for <br />right-of-way. The amount of property <br />Caroline Partners will receive from those lots <br />is minimal and of use to no one else but the <br />adjacent property owner. <br />Mr. Pecz o ws i asked what the ultimate use <br />of these little parcels will be. Mr. Inks <br />responded that the exact location of the <br />Mace Lafa ette crossover has not yet been <br />designed. Prellininary drawings show the <br />general path of it. We've been acquiring <br />property on the basis of those preliminary <br />drawings. To get full plans from the <br />engineer typically costs about 70% of the <br />project cost, so wbat ve' c been operating <br />on is something pretty good generally, but is <br />not exact. We've been acquiring property <br />based on what we've seer. This property.) <br />4223, sits almost it the heart of the <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.