Laserfiche WebLink
representative of normal work cvcles and expected <br /> pollutant Dischar�es to the POTW. <br /> �7. Sampling must be performed in accordance with <br /> procedures set out herein. <br /> � vii Compliance Certification. A statement3 reviewed <br /> by the ��� �tUser's aAuthorized �Representative as <br /> defined in Section 17-5.1, Division 1 of this Article and <br /> certified by a qualified professional, indicating whether <br /> �Pretreatment sStandards are being met on a consistent <br /> basis1 - and, if not, whether additional operation and <br /> maintenance (O&M) and/or additional pretreatment is <br /> required to meet the �retreatment sStandards and <br /> �Requirements. <br /> g:(viii) Compliance �Schedule. If additional pretreatment . <br /> and/or O&M will be required to meet the �Pretreatment <br /> sStandards;�,the shortest schedule by which the �� <br /> �User will provide such additional pretreatment and/or <br /> O&M must be provided. The completion date in this <br /> schedule shall not be later than the compliance date <br /> established for the applicable �Pretreatment sStandard. A <br /> compliance schedule pursuant to this subsection must meet <br /> the requirements set out � in the subsequent subpart <br /> �0)(2) of this Section 17-10. <br /> �. ix Signature and Report <br /> Certi rcation. All baseline monitoring reports must be <br /> �ig��d certified in accordance with °„� �- <br /> '���`�""�°'^��� subpart (p)(5)(a) of this Section 17-10, and <br /> signed by an Authorized Representative as defined in <br /> Section 17-5.1, Division 1 of this Article. <br /> (2) Compliance Schedule Reports. <br /> � The following conditions shall applv to the Compliance Schedule <br /> required bythe fore oin� Section(0)(1)(a)(viii) of this Section 17-10. <br /> a. The schedule shall contain pro�ress increments in the form <br /> of dates for the commencement and completion of major events <br /> leadin� to the construction and operation of additional pretreatment <br /> required for the User to meet the applicable Pretreatment Standards <br /> 47 <br />