Laserfiche WebLink
e. Plumbing contractor: A person who holds ^^ T~a~^~^'~^°~°° an Indiana Plumbing <br />Contractor's License and who, for compensation, undertakes to or submits a bid to or does themselves or <br />by others perform plumbing services and who is responsible for substantially all of the plumbing <br />services within the entire project, or one who fabricates units of plumbing substantially completed and <br />ready for installation. <br />Section 7. Chapter 6, Article 6, Section 6-24 (c)(5) be amended as follows: <br />(5) Reset and Reconnect fees, each .............................. .1:89 20.00 <br />Section 8. Chapter 6, Article 7, Section 6-36.3(c) be amended as follows: <br />(c) Fees. Each application for a permit for installation of heating, ventilating, air conditioning, <br />and refrigeration equipment or systems shall be accompanied by fees in accordance with the schedule <br />below, with a minimum permit fee being twenty dollars ($20.00). When the total capacity of any system <br />in any single installation is provided by more than one (1) unit, the sum of the capacities of each unit <br />and the total number of such units shall determine the fee. (Ord. No. 9528-04, S11) <br />Space heaters, each 30,000 Btu input or more ............................................. $-15:99 20.00 <br />Warm-air furnaces, unit heaters, cabinet heaters, and radiant tube heaters: <br />Up to 300,000 Btu input ............................................ 20.00 <br />rrrrt-~3n1'. ..................................... ~ c nn <br />a ,,,,:* .......................................... ~ n nn <br />@E6 ...................................... o . v v <br />300,000 Btu input or more .............................................................. X89 30.00 <br />Oil and gas conversions: <br />Up to 300,000 Btu input ............................................ .20.00 <br />R:r~r ,,,,;* i c nn <br />n~ ...................................................................................... <br />SeEe~in ........................ ................................... ~ n nn <br />300,000 Btu input or more ...................................................................... X99- 30.00 <br />Electric furnaces (air handling): <br />Less than 100 kw input .............................................. 20.00 <br />First ~'* ....................................................................................... ~ c nn <br />l* <br />S i n nn <br />. ....................................... <br />........................................... <br />eee <br />100 kw input or more ................................................................................ To . o 0 <br />2,5:99 30.00 <br />Air Conditioning: <br />a. Central, electric: <br />Less than 5 ton ................................................................ <br />~;,-~r , .,;. 20.00 <br />i c nn <br /> <br />SeEe~ ir-m, : * ..................................................................................... <br />5 to 10 tons ............................................................................................. 1&99 <br />x:98 30.00 <br />Over 10 tons ........................................................................................... 49:98 50.00 <br />b. Water chillers ......................................................................................... 75.00 <br />c. EMI-air blower ....................................................................................... X5:99 20.00 <br />Ventilating and exhaust systems: <br />Less than 500 CFM capacity ........................................................... 5.00 <br />500 to 1,500 CFM capacity ............................................................. 10.00 <br />(Plus 1.00 for each 500 CFM or fraction thereof in excess <br />of 1,500 CFM) <br />Ventilating commercial hoods: <br />500 CFM to 1,500 CFM capacity ..................................................... 299 30.00 <br />