Laserfiche WebLink
b. Special Exceptions - $300.00 <br />2) Improvement Location Permit: <br />a. First Term: $20.00 <br />b. Renewal: $20.00 <br />Section 4. Chapter 6, Article 2, Section 6.6.4(c) be amended as follows: <br />(c) All installations of wood burning stoves shall be inspected by the Department two (2) <br />times, one (1) each for preliminary venting work and for final, completed installation. The permit <br />holder shall notify the Department at least twenty-four (24) hours in advance of the time the work is <br />ready for inspection. If the work does not pass inspection, a reinspection fee of elhu~{-$9:98} <br />twenty-five dollars ($25.00) shall be charged for each future inspection of that state of work. <br />Section 5. Chapter 6, Article 4, Section 6-10 (c) be amended as follows: <br />(c) Schedule of permit fees. Permits issued for plumbing work within the city shall be <br />subject to the following fee schedule, with a minimum permit fee being twenty dollars ($20.00). <br />Each plumbing fixture or trap or set of fixtures on one trap, including water <br />and drainage piping therefor ..............................................................................$ 4~9 5.00 <br />Each backflow protection ................................................................................................ 5.00 <br />Each building sewer: <br />Under 100' .......................................................................................................... 10.00 <br />100' or over ......................................................................................................... 20.00 <br />Each building water: <br />Under 100' ........................................................................................................... 10.00 <br />100' or over ......................................................................................................... 20.00 <br />Each water softener ......................................................................................................... 6.00 <br />Each trailer park sewer ................................................................................................... 9.00 <br />Each drain within building for rainwater systems .......................................................... 4:99 5.00 <br />Each water heater and/or vent ........................................................................................ 6.00 <br />Each gas reconnection .................................................................................................... <br />~l <br />t <br />l <br />t <br />~ <br />t <br />^ <br />~ <br />" <br />'~ <br />^ X99 20.00 <br />Z nn <br />s ......................................................................... <br />r <br />e <br />i-- <br />i €~~S~ <br />s <br />2i~~-rn <br />-x- <br />6- <br />o <br />aE <br />Each gas piping system, ^r c ~~ ,per outlet ............................................................ . <br />.. X88 2.00 <br />Each industrial waste pretreatment interception, including its trap and vent, <br />excepting kitchen-type grease interceptors functioning as fixture traps ............. 7.00 <br />Installation, alteration or repair of water piping and/or water treating equipment......... 5.00 <br />Repair or alteration of drainage or vent piping ............................................................... 5.00 <br />Each drywell .................................................................................................................... 10.00 <br />Each lawn sprinkler system on any one (1) meter, including backflow <br />protection devices thereof ................................................................................... 5.00 <br />Fire protection sprinkler system: <br />Up to 30 heads .................................................................................................... <br />'" <br />^~~ <br />t <br />cnn <br />p <br />~ <br />~ <br />~ti <br />~$~ <br />~ <br />tl 20.00 <br />c nn <br />~ <br />~ <br />9 <br />- <br />~e~~ <br />I- <br />& <br />S <br />...................... ................... <br />J-G~C <br />6 <br />' cnn <br />~~ <br />Ei <br />"~~2~ c nn <br />fYttreaC <br />6 <br />.r <br />................................. <br />C <br />Plus each additional 10 heads thereafter.. <br />............................................ 7.00 <br />Gas tanks and pumps ...................................................................................................... 10.00 <br />Each re-inspection .......................................................................................................... 25.00 <br />Each additional final inspection ...................................................................................... 50.00 <br />Section 6. Chapter 6, Article 4, Section 6(d)(1)e be amended as follows: <br />