Laserfiche WebLink
L FAAY ATTACHMENT "C" <br />CITY OF SOUTH BEND, INDIANA <br />SOUTH MAIN ST TO LAFAYETTE CONNECTOR AND ROUNDABOUT <br />STAFF HOUR JUSTIFICATION - PROJECT DESIGN DEVELOPMENT <br />-`� Work Elam i <br />No <br />Slats, <br />P" M-.m <br />HOURS BV CLASSIFICATION <br />SmiurF 0'.1 F. Senior Tech. <br />Ckripl <br />Total <br />Hours <br />SLBCONSULTANT <br />COST <br />FINAL DESIGN <br />Find Plan SabriHd <br />Tkk and indu Sheaf <br />end and Gemral Notes Shm <br />Typical Cross Section <br />I <br />I <br />6 1 <br />1 <br />1 <br />2 <br />4 <br />24 <br />2 <br />8 <br />24 <br />3 <br />13 <br />Plat Shins <br />MaimenanceofTrdfic Plans (3 hales <br />Plan & Profile Shins <br />12 <br />7 <br />3 <br />2 <br />1 <br />2 <br />6 <br />8 <br />4 <br />24 <br />32 <br />16 <br />19 <br />32 <br />51 <br />24 <br />80 <br />Approach & Drive Details <br />Intersection Details <br />I <br />J <br />I <br />I <br />2 <br />12 <br />12 <br />18 <br />73 <br />13 <br />Roundabout layout and Plans <br />Pipe Structure, Water Line, Sanitary Sewer Details <br />Retaining Wall Sheets <br />Pavaanent Mr ' Plans <br />2 <br />4 <br />1 <br />2 <br />2 <br />1 <br />8 <br />8 <br />2 <br />8 <br />8 <br />28 <br />8 <br />16 <br />16 <br />28 <br />16 <br />32 <br />33 <br />34 <br />65 <br />26 <br />Traffic Strang Plans <br />Traffic S' Plans <br />Erosion Control Plans <br />4 <br />1 <br />8 <br />1 <br />1 <br />1 <br />2 <br />6 <br />2 <br />14 <br />8 <br />19 <br />12 <br />6 <br />24 <br />56 <br />29 <br />21 <br />R' and Soddin Tame <br />A oath Table <br />Undcdram tables <br />S' S Tebks and Sign Details <br />Road Summary Sheets <br />Cross Sections <br />Drains a atimes <br />Contruction Cast Estimate <br />Earthwork Con nation <br />Qumtity ConWations <br />Special Provision <br />Ruk 5 Submission <br />I <br />2 <br />2 <br />2 <br />1 <br />20 <br />1 <br />) <br />1 <br />2 <br />2 <br />2 <br />1 <br />2 <br />2 <br />8 <br />2 <br />6 <br />2 <br />` <br />2 <br />6 <br />4 <br />2 <br />4 <br />12 <br />16 <br />2 <br />2 <br />40 <br />4 <br />8 <br />16 <br />6 <br />6 <br />860 <br />6 <br />16 <br />2 <br />I <br />2 <br />45 <br />13 <br />27 <br />42 <br />30 <br />22 <br />) 07 <br />4 <br />8 <br />16 <br />40 <br />14 <br />UST Removal Corrdeution <br />Disposition of Final Plan Comments <br />1 <br />1 <br />2 <br />2 <br />2 <br />4 <br />12 <br />5 <br />19 <br />— <br />SUBTOTAL HOURS <br />N <br />23 <br />1 101 <br />326 <br />470 <br />5 <br />925 <br />$0 <br />FINAL CONSTRUCTION PLANS, BID DOCUMENTS AND BIDDING <br />1 Pim Tree' s Incbdm Cross Sections <br />"Snginvers Estimate <br />Contract Documents and Bid Forms <br />Advertisement nd Bidding <br />2 <br />1 <br />I <br />4 <br />2 <br />8 <br />12 <br />16 <br />16 <br />RFl and Addes,durn <br />2 <br />6 <br />8 <br />Bid Tabulation and Recommendation <br />2 <br />6 <br />8 <br />SUBTOTAL- <br />SUBTOTAL - hoof Way Dar <br />SUBTOTAL - Furst <br />SUBTOI AL - Construction Documents and Bidd <br />0 <br />0 <br />84 <br />0 <br />17 <br />26 <br />23 <br />8 <br />76 <br />78 <br />101 <br />26 <br />180 <br />213 <br />326 <br />60 <br />464 <br />228 <br />47D <br />0 <br />172 <br />553,957 <br />101,287 <br />925 <br />SO <br />E <br />TOTAL HOURS <br />HOURLY RATES (2010) <br />74 <br />$ 165.00 <br />281 <br />$ 160.00 <br />779 <br />S 115.00 <br />1 162 <br />f 105.00 <br />COSTS <br />TOTAL. COST <br />$ 12,210.00 <br />S44, %0.00 <br />$B9 9500 <br />5122,010.6 <br />EXPENSES Co tee, M' e & Misc. <br />C4nsbWion Consultation <br />SUBCONSULTANTS• <br />1155,244 SI55,244 <br />TOTAL FEE <br />COSTS BY CATEGORY <br />S 435.938.00 <br />Enviomm udDocumentation <br />S <br />Geotednical Investigation and <br />S 165.00 <br />$ 825.00 <br />S - <br />S 320.00 <br />S 1,280.00 <br />f 160.00 <br />s 23000 <br />$ 230.00 <br />S 230.00 1 <br />f • S <br />$ 34,440.00 1 <br />S 6303T <br />170.00 <br />170,00 <br />5,610.00 <br />170.00 <br />516,342 <br />$75,445 <br />58,187 <br />$235,150 <br />$95,005 <br />15,000 <br />and d Construction Dotusnents <br />R' -of We En and at Descriptions 42 Parcels <br />S 11,055.00 <br />S 165.00 <br />$ 42,880.00 <br />f 320.00 <br />$ 88,665.00 <br />f 230.00 <br />S 86,940.00 S <br />$ S <br />Construction Consultation <br />$ 12,210.00 <br />5 44, %0.00 <br />f 89,585.00 <br />S 122,010.00 S <br />6,120.00 <br />TOTAL AGREEMENT <br />1435.938 <br />Enhancement - Roundabout Peer Review <br />S14,000 <br />1449,938 <br />TOTAL AGREEMENT (with ENHANCEMENT) <br />loason -Fuhrr Assn win P.C. <br />Pm)m File No. Will 93 <br />A 70111 <br />