Laserfiche WebLink
ATTACHMENT <br />CITY OF SOUTH SEND, I NDIANA <br />SOUTH MAIN ST TO LAFAYETTE CONNECTOR AND ROUNDABOUT <br />STAFF HOUR JUSTIFICATION • PROJECT DESIGN DEVELOPMENT <br />Work ElasKm <br />No. <br />STAFF HOURS BY CLASSIITCATION <br />Total <br />SUBCONSULTANT <br />Shts. <br />Pruj. Manager <br />Smwrb <br />Civil <br />Smwr7erh. <br />Ckriul <br />Hours <br />COST <br />PRELIMINARY DESIGN <br />Survey and "minary Plotting <br />Field Sumey <br />4 <br />6 <br />320 <br />330 <br />Location Rene Control Survey and Plot NJ (B DI.Z) <br />$38,500 <br />Review Survey Fidel Data <br />8 <br />8 <br />Cocrd'nstion and Control of R'W Sub-COmuhant <br />1 <br />2 <br />2 <br />2 <br />7 <br />Preliminary Plan sobmittal <br />Designer Fkk1 Inspection <br />4 <br />4 <br />8 <br />Establsh Grade Controls. Prepare Overall Grade Profile <br />4 <br />16 <br />I2 <br />32 <br />Deli Cseometries Pr Overall Plan <br />2 <br />8 <br />24 <br />12 <br />46 <br />Utility Coordination <br />1 <br />8 <br />4 <br />4 <br />17 <br />P P Titk & lvdex Shoos <br />I <br />4 <br />5 <br />Prepare Pmknmwy T Cross Sections <br />1 <br />2 <br />8 <br />8 <br />19 <br />rmpmm Prelunizary Plan & Profile Sheets <br />2 <br />8 <br />16 <br />24 <br />50 <br />Roundabout 16 nand grading Plans <br />4 <br />16 <br />24 <br />4 <br />48 <br />Prefiminary ' ht -of-Wa <br />2 <br />4 <br />8 <br />14 <br />• c Des' <br />2 <br />12 <br />4 <br />Is <br />Prebminary Sanitary Sewn Design <br />1 <br />10 <br />4 <br />15 <br />Preliminary Water Lice Dcup <br />12 <br />4 <br />I8 <br />PrefirMnary Approach & Drive Dctail <br />2 <br />16 <br />18 <br />Prepare Structure Data <br />4 <br />12 <br />16 <br />Prepare Pre' Cross Sections <br />4 <br />24 <br />24 <br />52 <br />prepare Conceptual Maimatance Of Traffic <br />2 <br />It <br />10 <br />Prefirnamay Consuuctfon Cost Fstinate <br />1 <br />2 <br />4 <br />1 <br />8 <br />Ent,konmental Sommiln Reperl - HarMat (by ASC Group) <br />$9,127 <br />Environmental Screming R - Hist. Arch ( ASC Group) <br />$030 <br />Coordination and Control of Envirownental Sub-Consubant <br />1 <br />2 <br />2 <br />2 <br />7 <br />SUBTOTAL HOURS <br />0 <br />17 <br />76 <br />118o <br />464 <br />9 <br />746 <br />$53,957 <br />RIGHT -OF -WAY DESIGN <br />Dispossion orPrelimirmtry Plan Review Conromts <br />1 <br />2 <br />4 <br />1 <br />Check Plans <br />- .: isle Sheer and Index Sheet <br />1 <br />4 <br />5 <br />MP'Pl.n & Profile Shoots <br />2 <br />6 <br />24 <br />24 <br />56 <br />Signs <br />10 <br />12 <br />22 <br />Sign Structures <br />12 <br />32 <br />signals <br />1 <br />18 <br />Intersection Details <br />I <br />2 <br />19 <br />Roundabout Deails <br />2 <br />24 <br />62 <br />R ' ' Walls <br />6 <br />Special Drainage Structures <br />1 <br />7 <br />S Sewn Deails <br />2 <br />26 <br />WataSne Details <br />2 <br />20 <br />Maintmenot ofTraffsc <br />2 <br />4 <br />30 <br />Cross Sections <br />2 <br />8 <br />80 <br />Construction COAEstimne <br />1 <br />2 <br />I <br />8 <br />Ceeteehakal Iw (b Earth ExPleati0as, Inc.) <br />$7,167 <br />Coordination and Control of Gmleel"cal Sub-Consultant <br />1 <br />9 <br />Pavarmw Desisn <br />I <br />4 <br />2 <br />7 <br />Utility Coordination <br />1 <br />8 <br />2 <br />2 <br />13 <br />Hydraulics end Storm Sewer Calculations <br />2 <br />6 <br />36 <br />2 <br />46 <br />Construction Cost Estimate <br />1 <br />2 <br />8 <br />1 <br />12 <br />Field Check and Documentation <br />4 <br />4 <br />2 <br />10 <br />Di sition of field Cbek Review Conanmis <br />1 <br />2 <br />4 <br />8 <br />I S <br />Public: Information Mcetl aa00a <br />Traffic- Maotmance Plan <br />1 <br />2 <br />4 <br />7 <br />I <br />4 <br />12 <br />4 <br />21 <br />Pubes meeting <br />3 <br />3 <br />3 <br />9 <br />' snioe of Pudic Meming Commons <br />1 <br />2 <br />4 <br />2 <br />9 <br />Legal • sued Transfer Documents; (by DLZ Indiana, LLC) <br />$91,120 <br />Coordination and Control of R/W Sub- Consuhant <br />1 <br />2 <br />2 <br />2 <br />7 <br />SUBTOTAL HOURS <br />0 <br />26 <br />78 <br />213 <br />22t <br />18 <br />563 <br />$101,287 <br />LOKTon-Fishm Assoriurrs P.C. <br />Projrrr Fil, No. 901 F. 95 <br />Arrgasr 2010 <br />