My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2802 approving/authorizing the execution of an addendum to the Master Agency Agreement (4215 S. Main - demolition planning project)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2802 approving/authorizing the execution of an addendum to the Master Agency Agreement (4215 S. Main - demolition planning project)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 12:44:36 PM
Creation date
6/7/2011 1:26:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
acoustical materials, acoustical ceiling tiles and most thermal system insulation. Non - <br />friable materials are those that cannot be crumbled easily, such as resilient floor tiles and <br />cement asbestos (Transite) board. Although the emphasis is on detecting friable <br />materials, the possible presence of non - friable ACBM must also be considered, since <br />non - friable materials may be pulverized or otherwise damaged and release asbestos <br />fibers into the air during building demolition. <br />The next phase of the surveys will involve the selection of sampling areas and sample <br />locations. Sample areas are typically grouped based on material homogeneity. A <br />homogeneous area is one that contains suspect materials that appear by texture, color <br />and wear to be uniform and applied or installed at the same general time period. After <br />sampling areas have been determined and recorded, representative samples of suspect <br />materials will be collected. Only suspect material samples will be submitted for <br />laboratory analyses. Samples will be sealed in airtight containers, labeled, and <br />forwarded to an approved laboratory for analysis by the EPA - recommended method of <br />Polarized Light Microscopy coupled with dispersion staining. <br />Once sample analyses have been received, results will be reported as a Letter Report to <br />the City of South Bend. The requisite Indiana Department of Environmental <br />Management (IDEM), Notification of Demolition and Renovation Operations forms (with <br />documentation) will also be prepared for signature by an "authorized representative" of <br />the City of South Bend, and subsequent facsimile submittal to the Office of Air Quality. <br />Task 2 — Design Services / Demolition Quote Documents <br />CBBEL staff will design and prepare final quote documents for the project. All plans and <br />specifications will be prepared in accordance with City Standards and Specifications. <br />The bid documents will include recommendations provided in the Asbestos Survey to <br />address the requirements of the regulatory agencies involved with this demolition. <br />Specifications will be developed utilizing standard specifications provided by the City in <br />addition to CBBEL standard specifications. Applicable conflicts will be brought to your <br />attention for your input. <br />CBBEL staff will provide an opinion of probable cost based on the final quote <br />documents. This opinion will be based on the judgment of CBBEL engineering staff, <br />supplemented by local construction project history information provided by the City. <br />Task 3 — Quote Services <br />CBBEL will send out up to five (5) quote requests with the full quote documents to <br />contractors chosen by the City. CBBEL will assist the City in conducting a pre -quote <br />conference at the sites. CBBEL will address contractor questions and prepare and issue <br />addenda. Following quote opening, CBBEL will compile and certify quote tabulation <br />sheets and provide a contract award recommendation to the Owner. It is assumed that <br />City staff or representatives will coordinate the quote collection, quote opening, and the <br />preparation of the construction agreement. <br />3 Christopher B. Burke Engineering Ltd. City of South Bend: Demolition of 4215 Main Street <br />P01.100543.00000 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.