My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2802 approving/authorizing the execution of an addendum to the Master Agency Agreement (4215 S. Main - demolition planning project)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2802 approving/authorizing the execution of an addendum to the Master Agency Agreement (4215 S. Main - demolition planning project)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 12:44:36 PM
Creation date
6/7/2011 1:26:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHRISTOPHER B. BURKE ENGINEERING, LTD. <br />220 West Colfax Avenue Suite 500 South Bend, IN 46601 TEL(574)282-8001 FAX(574)282-8003 <br />G <br />November 12, 2010 <br />Bill Schalliol <br />City of South Bend <br />Division of Economic Development <br />12th Floor County -City Building <br />South Bend, IN 46601 <br />Subject: Demolition of 4215 Main Street <br />Professional Services Proposal <br />Dear Mr. Schalliol: <br />Christopher B. Burke Engineering, Ltd ( CBBEL) is pleased to provide this proposal for <br />professional engineering services related to the Demolition of 4215 Main Street in the <br />City of South Bend. The following is our understanding of the assignment, scope of <br />services, and estimated fee in support of the project. <br />UNDERSTANDING OF THE ASSIGNMENT <br />CBBEL understands the City is seeking assistance in the development of quote <br />documents for the demolition of the property at 4215 Main Street. The project is being <br />proposed by the City as a means to prepare the property for future development or for <br />use in a separate Public Works improvement project. <br />The project includes the preparation of an Asbestos Survey in support of the proposed <br />demolition and the demolition project specifications. <br />SCOPE OF SERVICES <br />Services to be provided by CBBEL for this work have been identified as follows: <br />Task 1- Asbestos Survey <br />An Asbestos - Containing Building Material (ACBM) survey will be performed for the <br />existing residential structure by our sub - contractor, Phifer Environmental Services, LLC, <br />(PES) a State of Indiana Certified. Asbestos Inspector. The surveys will begin with a <br />walk- through of the existing structures to document the locations of friable and non - <br />friable materials that may be present. Friable materials are those that can be pulverized <br />or reduced to powder by moderate pressure, such as spray - applied fireproofing and <br />Christopher B. Burke Engineering Ltd. City of South Bend: Demolition of 4215 Main Street <br />P01.100543.00000 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.