My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2733 approving/authorizing the execution of an addendum to the Master Agency Agreement (Olive Rd. Right-Of-Way Site Clearance)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2733 approving/authorizing the execution of an addendum to the Master Agency Agreement (Olive Rd. Right-Of-Way Site Clearance)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 12:51:02 PM
Creation date
6/2/2011 2:36:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DL <br />ENGINEERS • ARCHITECTS • SCIENTISTS <br />PLANNERS -SURVEYORS <br />July 14, 2010 <br />Letter Agreement for Olive Road Clearing of Right of Way and Residential Demolition <br />Page 3 <br />regulated asbestos containing materials from the structures. These specifications shall <br />include provisions for the proper handling, removal, transportation, and disposal of the <br />asbestos containing materials. The asbestos abatement specifications will be included in <br />the overall demolition specification package and will not be bid separately. <br />C. TASK 3 — BID PHASE SERVICES <br />The ENGINEER will perform a pre -bid walk - through. ENGINEER will collect contractor <br />questions as they occur. The ENGINEER shall answer contractor questions in the form of a <br />published addendum(s). The ENGINEER shall publish addendums for the project as necessary. <br />The ENGINEER will attend the bid opening and assist in the review of all bids, providing <br />OWNER with a written recommendation as to which is the lowest qualified and responsive <br />bidder for the scope of work identified herein. <br />Once the OWNER issues the Notice of Award to the successful bidder, the ENGINEER will <br />develop, for the OWNER's review, the American Institute of Architects (AIA) agreement <br />between the OWNER and the contractor. <br />D. TASK 4 — DEMOLITION /CONSTRUCTION PHASE SERVICES <br />The ENGINEER will provide periodic Construction Administration throughout the demolition <br />phase of the project. This item includes the following work elements: <br />1. Facilitate pre - construction conferences. Prepare Agenda Meeting Report. <br />2. Perform periodic on -site observation. Review and complete project documentation. <br />3. Prepare Field Observation Report. <br />4. Review Project Submittals for compliance with Specifications. <br />5. Issue Supplemental Instruction and Proposal Requests. <br />6. Perform Final Inspection of Work. <br />7. Prepare Certificate of Substantial Completion. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.