Ms. Ann Kolata <br />June 15, 2010 <br />SB1060.400.0001 <br />Page 4 <br />Task 4 Revised Remediation Work Plan Preparation <br />Hull will prepare a revised Remediation Work Plan (RWP) in accordance with IDEM VRP <br />requirements. The revised RWP will incorporate all historical data and will appropriately <br />address IDEM's comments to the previous RWP in IDEM's letter dated September 28, 2004. <br />This task assumes that generation of VRP Tier II I non - default cleanup goals is not necessary. <br />SCHEDULE <br />Hull will enter into the Phase II ESA investigation within four to six weeks of receiving <br />authorization to proceed by the City. Hull anticipates that field activities will be completed in one <br />week. Based on standard turnaround times, Hull will receive chemical analytical results from <br />the laboratory within two to three weeks of completing fieldwork. Hull will prepare a <br />summarization of data within one week of receiving final analytical reports and a draft report <br />within two weeks of completing the data summary. Hull understands that the City's deadline to <br />submit an Interim Remediation Work Plan for the Huckins and Lathe Sites to the IDEM is <br />September 30, 2010, and will endeavor to meet that deadline. <br />COMPENSATION <br />A breakdown of costs is presented in Table 1 (Attachment B), which describes a not -to- exceed <br />amount for the project of $42,694 for the Phase II Site Assessment and report preparation <br />activities. The fees have been developed based on our estimate of hours for each labor <br />category expected to be involved in the project. The rates used to calculate compensation for <br />each labor category are within the ranges presented in Table 2 (Attachment B). Actual rates <br />and hours expended for each category may vary based on project personnel used. Additionally, <br />personnel in labor categories not included in Table 1 or Table 2 may be used. The Client will be <br />billed for actual labor hours and other project costs with the total project cost not to exceed that <br />shown in Table 1, unless additional work is required as discussed below. If agreed upon, <br />subcontractors (e.g., drilling and chemical analyses) will bill directly to the Client and Hull would <br />review and, if applicable, recommend approval of the contractor's invoice. If subcontractor's <br />fees are included on Hull's invoices, the subcontractor's fees will be billed as described in Table <br />2, Note 7. The project will be billed on a four -week basis with payment due to Hull within thirty <br />days after receipt of an invoice. <br />ADDITIONAL WORK <br />Additional work beyond the Scope of Work defined herein shall not be performed until such time <br />as an amendment to this proposal, including the scope of the additional work and associated <br />costs, has been prepared in writing to address the additional work and said amendment has <br />been approved by the Client in writing. <br />Specific items not within the Scope of Work on this project include, but are not limited to the <br />following: <br />collection and analysis of more than 49 soil samples, plus QA/QC samples for <br />chemical analysis; <br />2, calculation of VRP Tier III Cleanup Goals as part of the Remediation Work Plan; <br />and <br />