My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2699 approving/authorizing the execution of an addendum to the Master Agency Agreement (Phase II Environmental Site Assessment at Former South Bend Lathe & Huckins Sites)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2699 approving/authorizing the execution of an addendum to the Master Agency Agreement (Phase II Environmental Site Assessment at Former South Bend Lathe & Huckins Sites)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 12:53:41 PM
Creation date
5/31/2011 3:57:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Ann Kolata <br />June 15, 2010 <br />SB1060.400.0001 <br />Page 3 <br />VOCs using Indiana Modified Method 50351; <br />Soil Samalina Procedures <br />Soil sampling will be conducted using a direct -push unit. Hull's field representative will screen <br />samples using a photoionization detector (PID). The driller will be required to decontaminate all <br />down -hole equipment between sampling depths using a non - phosphatic detergent (e.g., <br />Liquinox) and rinsing with distilled water. <br />Soil samples will be selected based on Hull's field observations. In general, those samples <br />exhibiting the highest PID readings or other evidence of impact will be selected for chemical <br />analysis. In addition, a second (deeper) soil sample may be selected and submitted to the <br />laboratory to evaluate the vertical extent of contamination. If samples in a given boring exhibit <br />little variation in the degree of apparent contamination, Hull's field representative may <br />preferentially select the surface sample (i.e. 0 to 2 ft. bgs) for analysis. Unused samples will be <br />placed in a Department of Transportation- approved 55- gallon drum. The driller will <br />decommission the borings by filling the boreholes with bentonite chips. <br />Task 3 Letter Report Preparation <br />Upon receiving analytical data from the laboratory, Hull will prepare a brief summary report to <br />document field activities and findings of the Phase II evaluation. The report will include the <br />following: <br />1. a narrative describing the Site, including a summary of work completed; <br />2. a summary of data collection activities and rationale for sampling locations and <br />frequencies; <br />3. a comparison of chemical analytical data to VRP standards; <br />4. a description of the physical and chemical characteristics of the subsurface <br />materials encountered; <br />5. a bibliography of references; <br />6. other supporting information that present data and /or conclusions (e.g., drilling <br />logs, tables, etc.); and <br />7. recommendations for further activities. <br />Upon completion of the Initial Phase II investigation activities one draft copy of the report will be <br />submitted. Three copies of the final report will be prepared upon approval of the City. <br />1 Although VOCs have not been detected at concentrations exceeding VRP Tier II Nonresidential <br />Cleanup Goals at these locations, they have been detected in these areas at lower concentrations; <br />samples will only be submitted for VOC analyses if evidence of VOC impacts (e.g., elevated PID <br />readings) is observed during soil boring installation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.