Laserfiche WebLink
• <br />n <br />LJ <br />XVI. Section A.2 of Appendix "D" is modified as follows: <br />2. The ENGINEER will be paid for the work performed under Appendix "A" of <br />this agreement on a Lump Sum basis in accordance with the following <br />schedule, except as noted in the items below: <br />a. <br />Field Surve (including Route Surve Plat <br />$83,000.00+ <br />b 1. <br />Preliminary Roadway Design and Plans 3"0 20% Complete) <br />$53,300.00 <br />b 2. <br />Bid Package 1 <br />$202,000.00 <br />c. <br />Maintenance of Traffic Concepts <br />$4,000.00 <br />d. <br />Public Information Meeting, Hourly Rate, as required <br />$6,000.00 <br />e. <br />Conce tual Traffic Signal Design <br />$12,300.00 <br />f. <br />Utility Coordination, Hourly Rate, as required <br />$10,000.00 <br />9. <br />Coordination with Memorial Hospital and IN ©OT, Hourly <br />Rate, as required <br />$12,500.00 <br />h. <br />RM Engineering 40 6 Parcels $2,700 per Parcel), if required <br />$16,200.00 <br />i. <br />Title Abstracting (40 6 Parcels @ $325 per Parcel), if required* <br />$1,950.00 <br />j. <br />Geotechnical Evaluation <br />$7,500.00 <br />k. <br />Bid Packa e 2 <br />$48,000.00 <br />XVIL Section A.17 of Appendix "E" is modified as follows: <br />.... . ...... ... ... l�t�l�.�l�l• .1�12L J�C�sl�� [���1�.I�. �" <br />XVIII. Section A.19 of A endix "E" is modified as follows: <br />XIX. Section A.21 of Appendix "E" is modified as follows: <br />XX. Section A.23 of Appendix "E" is modified as follows: <br />XXI. Section A.27 of Appendix "E" is modified as follows: <br />27. Permitting Applications except for Rule 5 -- Erosion Control. <br />11 of 13 <br />Supplemental Agreement No. 1 <br />