Laserfiche WebLink
• <br />• <br />professional retained by the Contractor shall bear such <br />professional's written approval when submitted to the ENGINEER. <br />The ENGINEER shall be entitled to rely upon the adequacy, accuracy <br />and completeness of the services, certifications or approvals <br />performed by such design professionals. <br />XI. Add Item 12 to Appendix "B" as follows: <br />1. Construction inspectionlObservation /Administrative services <br />XII. Section A of Appendix "C' is modified as follows: <br />A. Field Survey complete within x515 days after receipt of notice to proceed for <br />both Bid Packages 1 and 2. <br />XIII. Section B of Appendix "C" is modified as follows: <br />B. Roadway Design and Plans Bid Package 1 <br />1. Preliminary Plans within -7-a 30 calendar days after completion of the Field <br />Survey. <br />2. Right of Way Plats and Legal Descriptions, if required, within 21 days after <br />approval of the preliminary plans and Ferseipt of the title abstFad;;g. <br />3. Final Plans within 30 calendar days after approval of Preliminary <br />Plans, includes 7 calendar days of OWNER review time. <br />4. Final Tracings within 21 calendar days after approval of Final Plans, <br />includes 7 calendar days of OWNER review time. <br />5 The anticipated letting date for Bid Package 1 is June 28, 2010- <br />XIV. Add Section D to Apoendix "C" as follows: <br />D. Bid Package 2 <br />1. Preliminary Plans within 15 calendar days after bidding of Bid <br />Package 1. <br />2. Final Plans within 30 calendar days after approval of Preliminary <br />Plans, includes 7 calendar days of OWNER review time. <br />3. Final Tracings within 30 calendar days after approval of Final Plans, <br />includes 7 calendar days of OWNER review time. <br />4. The anticipated letting date for Bid Package 2 is September 13, 2010. <br />XV. Section A.1 of Appendix "D" is modified as follows: <br />1. The ENGINEER shall receive as payment for the work performed under <br />this Agreement the total fee not to exceed of $245,250.00 $456,750.00, <br />unless a modification of the agreement is approved in writing by the <br />OWNER. <br />10 of 13 <br />Supplemental Agreement No. 1 <br />