Laserfiche WebLink
4. Sec. 1.7- 10(a)(2) - Page 29, Whenever deemed <br />necessar the Director ma re wire Users to <br />restrict their discharge during peak flow Periods <br />desi nate that certain wastewater be dischar ed <br />only into specific relocate and /or <br />consolidate prij ntsof dischar a separate sewa e <br />wastestreams from industrial wastestreams and such <br />other conditions as may be necessar to rotect the <br />POTW and determine the User`s com dance with the <br />requirements of this Division This new <br />requirement is a concern because it may require a <br />suspension of operations during peak flow periods <br />and significant modifications to our facilities. <br />5. Seca 17- 10(a)(3) - Page 30, The Director may <br />,KegLiire any person dischar in into the PCTW to <br />install and maintain on their ro ert and at <br />their ex ens- a suitable stora e and flow- control <br />--c— nv1 Ca y , iUx- rlow e uailzata.on. This new <br />requirement is a concern because it may require <br />significant modifications to our facilities. While <br />we have some ability to equalize flow, wastewater <br />storage facilities are limited. <br />Please contact me at (574) 654 --1317 if you have any <br />questions <br />Sincerely, <br />David R. Lisak <br />Environmental Manager <br />1/N Tek T/N Kote <br />7009 3410 0001 4341 5017 <br />PRETREATMENT <br />CC: Kim Thompson., City of South Bend, IN <br />Parfne,ships belvveen suWdiories of ArcelorMittal and Nippon Steel Corporation <br />