My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/18/1914 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1914
>
08/18/1914 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:36:56 PM
Creation date
8/2/2018 2:03:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
8/18/1914
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tuesday August 16th.,1914 Continued. <br />The City Civil Engineer filed the estimated cost on the following improvements. <br />I herewith submit the estimated cost of the Donald Street Grade, <br />'� Curb and walk improvement from Michigan St to'Main Street at ........... $1,251.00 <br />I herewith submit the estimated cost of the Kline Street and <br />Calvert Street pipe sewer improvement from Vistula Avenue to Vernon.Street..$4,469.90 <br />I herewith submit the estimated cost of the south side of Fox Street <br />walk and curb improvement from Miami Street to the east line of Demler's 2nd. <br />Addition at........................................................... 452.40 <br />I herewith submit the estimated cost of the Marion Street <br />Bituminous Macadam Resu rfecing improvement from the west line of St. Joseph River <br />Street to the east line of Lot No. 5 Hammond and Whitcomb Addition at ....$1,941.00 <br />I herewith submit the estimated cost of the Lafayette Street and <br />Marion Street pipe sewer improvement from a point about 100 feet north of the north <br />line of Navarre Street to a point about 100 feet west of the west line of Lafayette <br />Street at$................................................................ $1,800. 00 <br />I herewith submit the estimated cost of the Johnson Street Pavement <br />1 improvement from Portage Avenue to Vassar Avenue at ......................$4,476.00 <br />The City Civil Engineer filed the ..following report, and ta resolution was adopted <br />and ordered set for a hearing on same. <br />I wish to call your attention to the fact that the County Com- <br />missioners are constructing a Concrete Culvert across Bowman Creek at Dubail Ave. <br />This culvert is practkcally completed with the exception of t:!e fill. It is the cus- <br />tom for the County to build these culverts and the City to make the necessary ap- . <br />proaches. I gave prepared a resolution for the grading of Dubail Ave. from High <br />St to. Dale Avenue which would provide sufficient dirt to make the fills. <br />GRADE IMPROVEMENT RESOLUTION N0. 346. <br />J Resolved by the Board of Public Works of the City of South Bend, <br />St. Joseph County, State of Indiana. That it is deemed necessary to improve Dubail <br />Avenue from High Street to Dale Avenue as follows,to-wit:- . <br />By grading said Dubail Avenue from property line to property <br />line to the established grade. As shown do the plans and in accordance with the <br />profiles, detail drawings and specifications on file in the office of the Depart- <br />ment of Public Works of the City of South Bend, Indiana, in accordance with and <br />the profile, details, drawings and specifications on file in the office of the <br />Department of the Board of Public Works of saId City and such improvement is now <br />ordered. <br />The cost of said improvement, including the cost of street and <br />aley intersections, shall be assessed upon the real estate abutting on said Dubail <br />Avenue* all according to the Method and manner provided for in an Act of the General <br />Assembly ofnthe State of Indiana, entitled, " An Act Concerning Municipal Corpor- <br />tions," approved March 691905, and in accordance with and pursuant to the provisions <br />of all amendatory and supplemental acts thereto, passed by the General Assembly of tb. <br />the State of Indiana. Assessments, if deferred, are to be paid in ten equal annual <br />installments, with interest at the rate of Six per cent per annum. A bond or b6ts <br />sha 1 be issued to the contractor in payment of such work, unless the property owners <br />pay said assessment before saald bond. or bonds are issued. Under no circumstances <br />shall the City_' of South Bend, be, or be held responsible for any sum or sums due form <br />from said property owner or owners for said work or for the collection of the same,or <br />for the payment of any bond, bonds, certificate or certificates, issued to said <br />contractor in payment for such work, except for such moneys as shall have been <br />actually received by the City from the assessments for such improvements, or such <br />moneys as said C ty is by said above entitled Act required to pay. All proceedings <br />had, and work done in the making of said improvement, assessement of property, collef <br />collections of assessments and issuance of bonds therefor, shall be as provided for A <br />in said above entitled Act and amendments thereto. <br />
The URL can be used to link to this page
Your browser does not support the video tag.