Laserfiche WebLink
411 <br />The following .report was filed with the Boa�d by City Civil Engineer. <br />Board of Public works <br />South Bend, Indiana <br />Gentlemen: — <br />I have made a careful inspection of the Brick pavement of High Street be— <br />tween Sample St. and Broadway and find that a barge percent of the brick are showing <br />more gear than they should, for the length of time they have been laid. Tgis pavement <br />was laid by T.C.Barnes, and as he has a one year guarantee, I would suggest that you <br />take this matter up with him 'before the guarantee expires. <br />Very t ruly, <br />vM. S. MOORE, <br />City Enginneer. <br />',The above matter was ordered deferred until Tuesday July 21st.,1914 at 10:00 A.H. <br />and Clerk instructed to have Mr. T.C.'. Barnes present at said meeting. <br />Communication received and placed on file regarding the placing of a <br />pavement on Blaine Avenue. <br />Presideht. <br />