Laserfiche WebLink
d. . <br />Hearing given on Improvement Resolution No. 324 for pipe sewer on St. Peter <br />`Street and Sorin Street from South Bend Avenue to Eddy Street. In the City of South Bend, <br />Indisra. <br />Upon said hearing remonstrators appeared and a remonstrance was filed. <br />The Board after due consideration decided to deferr all action on the above improvement <br />until Tuesday July 14th.11914. at 7:45 P.M. <br />Hearing given on assessment roll and final est mated for concrete pavemEn t <br />on Howard Street from Niles Avenue to Leeper Aveme, under Improvement Resolution No. 217 <br />1913- In t he City of South Bend, Indiana. <br />In the above matter Mr. S. Krueger appeared remonstrating against assessment <br />on Lot 9 Studebaker Leeper Avenue Addition. The Board after due consideration modified his <br />assessment from Two Hundred and *ifty nine dollars and ten cents ($259.10) to Two Hundred <br />($200.00)_Dollars. Fifty nine dollars and ten cents ($59.10) to be pro ratedto the balance <br />of the abutting property owners. No remonstrance being filed. The therefore find that the <br />property assessed in said roll filed June 16th. ,1914 is benefited in the amount of assess- <br />ments as shown on said rolls, and the Board further find that the assessment roll filed <br />June 16th.21914 and the final estimate allowed June 16th.21914 should be and the same is <br />in all things ratified, confirmed and approved. <br />Hearing given on assessment roll and final estimate for Pavement on lst. <br />alley west of Park Avenue from Navarre Street to La Monte Terrace, Under Improveme� t <br />Resolution No. 300. In the City of South Bend, Indiana. <br />In the above matter no remonstrators appeared and no remonstrances were <br />filed. The Board therefore find mat the property assessed in said roll filed June 16th. <br />1914 , is 'benefited in the amount of assessment as shown on said rolls, and the Board further <br />find that the assessment roll filed June 16th.21914 and the final estimate allowed June <br />16th.,1914 should be and the same are hereby in all things ratified, confirmed and approved* <br />Partial estimate allowed C. L. Headley for walk and curb on Meade Street <br />✓ for the amount of..............................................................$961.73 <br />Partial estimate allowed H. N. Barnes on Pavement.on Ford Street for <br />fthe amount of..................................................................27.19 <br />Partial estimate allowed H. N. Barnes on Grade, curb and walk on <br />Orange"Street, for the amount of ........................... ....................... $315.32 <br />Contract for pipe sewer on Tablot Avenue from South Berk. Avenue to Howard <br />Street, under Improvement Resolution No. 3192 was awarded to L. H. Webster for...$929.35 <br />Contract for the resmrfacing of South Lafayette Street from Sample Street <br />Jto a point 251-1/2 ft. north of the north lineof Tutt Street, was awarded to Rankert & <br />Eggleston, Contractors with Trinidad asphalt.i inch binder 1-1/2 inch top ......$$4,426.17 <br />The following report was filed by the City Civil Enginneer and read by the Board and placed <br />on file. <br />Board of Public Works <br />City of South Bend, Ind. <br />GentlVAL :- <br />Regarding the surplus dirt on E. Madison Street, will say that it is my <br />C.S.B.&N.I. Pry. Co. removed all the dirt for between their track when the same <br />that tey are not responsible for any surplus dirt which might be on the Street. <br />Very truly, <br />wa. S. Moore, <br />City Engineer. <br />opinion the <br />was laid and <br />Plat of Ed. N. Shankts 2nd. Addition to River Park now a part of the City of <br />South Bend, Indiana, was approved by the Board. <br />