My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/07/1914 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1914
>
07/07/1914 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:32:26 PM
Creation date
8/2/2018 12:31:44 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/7/1914
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1399 <br />Tuesday July 7th . ,1914. <br />Board met kn regular session at 10:00 A.M. 19Ir. A. H. Rice absent. <br />✓ Bids were received,openedand read forresurfacing pavement on South <br />Lafayette Street,under improvement Resolution No. 319. The. sane were referred to the <br />City Civil Engineer for tabulation to be reported back.at 1:45 P.M. <br />Bids were received, opened and read for pipe sewer, on Talbot Avenue, under <br />✓Improvement Resolution No. 319. The same were referred to the City Civil Engineer for <br />tabulation to:be reported back at 7:45 P.M. session. <br />Representatives of the Michigan Central Railway Company appeared before <br />the Board in regard to the moving of theLturn table now on ~the °City's "ground at Cedar <br />,, Street near Emerick Street and the grates ah La Salle Avenue at Emerick Street. The Board <br />decided to go out and look at the above. <br />Bill presented by M. Feser for work done for the City, and the same was <br />,/referred to the City Engineer for measurements. <br />r <br />Petition for a pavement on Diamond Avenue from Michigan Avenue to end of <br />Street. The same was referred to the City Civil Engineer .for a resolution. <br />Engineer filed assessment roll and final estimate for cement walk and curb <br />on Frances Street from Alley south of Sorin Street to Madison Street, under Improvement <br />Resolution No. 302. In the City of South Bend, Indiana. <br />Resolved, that notices as to the amounts of assessments be published for <br />six consecutive days in the South Bend Daily News -Times, commencing on the 13th., day of <br />July 1914 stating that this Eoard will giVe a hearing on the amount of such assessments <br />at its office in the City Hall on the 29th., day of JUly,1914 at 7:45 P.M. <br />Resolved further that the entire work under the above contract be accepted <br />and -approved and the fnal estimate thereon allowed. Notice of this resolution shall be <br />published on the 13th., day of July,1914 in the South Bend News -Times, stating that <br />this Board will give a hearing on the acceptance of such work at its office in the City <br />Hall on the 28th.2 day of July,1914 at 7:45 P.A. <br />Engineer filed assessment roll and final est-mate for grade, curb and walk <br />on Dale Avenue from Dayton Street to Bowman -Street, under Improvement Resolution No. <br />284. In the City of South Bend, Indiana. <br />Resolved, that' notices as to the amounts of assessments be published for six <br />consecutive days in the South Bend Daily News -Times, commencing on the.13th., day of <br />iluly,1914 stating that this Board will give a hearing on the amount of such assessment at <br />its pffice in the City Hall on the 213th., day of July21914 at 7:45 P.M. <br />Resolved further, that the entire work udder the above contract be accepted <br />and approved and the final estimate thereon allowed. Notice of this resolution shall be <br />published on the 13th., day of July,1914 in the South Bend, Daily News -Times, stating <br />that this Board will give a hearing on the acceptance of such work at its office in the <br />City Hall on the 28th., day of July,1914. at 7:45 P.M. <br />Application for the setting of a billboard on W. Sample Street by the <br />South Bend Billposting Company was approved by the Board. <br />Extengion of time for sixty days granted by the Board to Szabo & Co. Contrs. <br />on 2 story brick building on N.W.Corner of Maple and Division St. for Martin Kearewski <br />with the understanding that resolution passed by the Board for the covering of sidewalk <br />shall be complied with. <br />The following persons were ordered to repair or construct sidewalks in front of their prope <br />/oroperty within thirty days from notice or the sane would be constructed Or repaired by <br />V the City under Improvement Resolution.No. 294 for Various Street. In the City. Mrs. Emma <br />W. Harlin in front of Hot 23 Keasey Street on 213 and 215 E. Keasey St, in care of Wilber <br />Harlin, Guardain. <br />President. <br />
The URL can be used to link to this page
Your browser does not support the video tag.