My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Lawson Fisher Associates - East Bank Trail Slope Stabilization
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Lawson Fisher Associates - East Bank Trail Slope Stabilization
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:40:44 AM
Creation date
7/25/2018 10:14:28 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. Engineer may alter the distribution of compensation between individual project phases or other <br />identified work noted herein to be consistent with services actually rendered, but shall not <br />exceed the total Lump Sum amount unless approved in writing by the Owner. <br />2. The Lump Sum includes compensation for Engineer's services and services of Engineer's <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to account <br />for labor, overhead, profit, and Reimbursable Expenses. <br />3. The portion of the Lump Sum amount billed for Engineer's services will be based upon <br />Engineer's estimate of the percentage of the total services actually completed during the billing <br />period. <br />B. Period of Service: The compensation amount stipulated in Compensation is conditioned on a period <br />of service not exceeding 9 months exclusive of Construction Phase. If such period of service is <br />extended, the compensation amount for Engineer's services shall be appropriately adjusted. <br />C2.03 Compensation for Basic Services --- Standard Hourly Rates Method of Payment (HNTE) <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A and as described and identified <br />in Paragraph C2.01 with compensation as HNTE as follows: <br />An amount equal to the cumulative hours charged to the Project by each class of Engineer's <br />personnel times Standard Hourly Rates for each applicable billing class for all services <br />performed on the Project, plus Reimbursable Expenses and Engineer's Consultants' charges, <br />if any. <br />2. Engineer's Reimbursable Expenses Schedule and Standard Hourly Rates are attached to this <br />Exhibit C. as Appendices 1 and 2. <br />Engineer may alter the distribution of compensation between individual phases of the work <br />or other identified work noted herein to be consistent with services actually rendered, but <br />shall not exceed the total estimated compensation amount unless approved in writing by <br />Owner. See also C2.04.C.2 below. <br />4. The total estimated compensation for Engineer's services included in the breakdown by <br />phases as noted in Paragraph C2.01 incorporates all labor, overhead, profit, Reimbursable <br />Expenses and Engineer's Consultants` charges for items identified as HNTE. <br />5. The amounts billed for Engineer's services under Paragraph C2.01 will be based on the <br />cumulative hours charged to the Project during the billing period by each class of Engineer's <br />employees times Standard Hourly Rates for each applicable billing class, phis Reimbursable <br />Expenses and Engineer's Consultants' charges. <br />6. If amounts billed under this compensation method are within ten percent (10%) of the <br />maximum amount payable prior to the satisfactory completion of the described services, the <br />Engineer shall notify Owner and the status will be evaluated. <br />7. The Standard Hourly Rates and Reimbursable Expenses Schedule will be adjusted annually <br />(as of January 1) to reflect equitable changes in the compensation payable to Engineer. <br />Page 2 <br />Exhibit C—Basic Services (other than RPR and Post -Construction) — Lump Sum Nlethod of Payment <br />EJCDC E-500 Agreement Bethveen Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.