My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Lawson Fisher Associates - East Bank Trail Slope Stabilization
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Lawson Fisher Associates - East Bank Trail Slope Stabilization
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:40:44 AM
Creation date
7/25/2018 10:14:28 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT C, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer for <br />Professional Services dated July 26, 2018. <br />Payments to Engineer for Services and Reimbursable Expenses <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A at Lump Sum Method of <br />Payment (LSUM) other than services identified as Standard Hourly Rates Method of Payment not <br />to exceed (HNTE). The total shall not exceed $90,740.00 unless an amendment is executed which <br />increases the maximum amount payable. <br />B. Compensation: <br />1. An HNTE budget amount of $7,500 for Item A1.01 - Assist the City with Flood Damage <br />Assessment and Cost Estimates. Some of these tasks have already been completed per the <br />request of the City: <br />The incurred cost will be paid as a Lump Sum: <br />a. Drawing Assessment with Cost Estimates $ 4,845.72 (LSUM) <br />b. Budget remaining for Task A1.01 $ 2,654.28 (HNTE) <br />Total Budget Amount (Task A1.01): $ 7,500.00 <br />2. An HNTE budget amount of $26,893.00 for Primary Work Elements based on the following: <br />a. Geotechnical Field Investigation and Evaluation $26,893.00 (HNTE) <br />3. A Lump Sum Amount $54,847.00 for the Primary Work Elements noted under Task A1.02 <br />- Prepare Schematic Design Documents: <br />a. Site Survey <br />b. Schematic Design Services <br />Total LSUM Amount: <br />C2.02 Compensation for Lump Sum Method of Payment (LSUM) <br />$ 9,500.00 (LSUM) <br />$46,847.00 (LSUM) <br />$56,347.00 (LSUM) <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A as described and identified in <br />Paragraph C2.01 with compensation as LSUM as follows: <br />Page 1 mm <br />Exhibit C --Basic services (other than RPR and Post -Construction) — Lump Suns Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright D 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.