Laserfiche WebLink
21-12 (e) (2) (E) i. The fill shall be placed in layers no greater than 1 foot deep before <br /> compacting to 95% of the maximum density obtainable with �e either the <br /> Standard or Modified Proctor Test method. <br /> 21-12 (e) (2) (F) iii. Manufactured homes with fully enclosed areas formed by <br /> foundation and other exterior walls below the flood protection grade (crawlspaces <br /> or under floor spaces) shall be designed to preclude finished living space and <br /> designed to allow for the entry and exit of floodwaters to automatically equalize <br /> hydrostatic flood forces on exterior walls as required for elevated structures in <br /> Section(���83 21-12 (e�2Z(D). <br /> 21-12 (e) (5) (A) Located within SFHAs, established in Section 21-12 (c) (2) of this <br /> ordinance, are areas designated as floodways. The floodway is an extremely <br /> hazardous area due to the velocity of floodwaters, which carry debris, potential <br /> projectiles, and has erosion potential. If the site is in an identified floodway, the <br /> Floodplain Administrator shall require the applicant to forward the application, <br /> along with all pertinent plans and specifications, to the Indiana Department of <br /> Natural Resources and apply for a permit for construction in a floodway. Under the <br /> provisions of IC 14-28-1 a permit for construction in a floodway from the Indiana <br /> Department of Natural Resources is required prior to the issuance of a local <br /> building permit for any excavation, deposit, construction, or obstruction activity <br /> located in the floodway. This includes land preparation activities such as filling, <br /> grading, clearing and paving etc. undertaken before the actual start of construction <br /> of the structure. However, it does exclude non-substantial additions/improvements <br /> to existing (lawful) residences in a non-boundary river floodway. (IC 14-28-1-26 <br /> allows construction of non-substantial additions/ improvements to residences in a <br /> non-boundary river floodway without obtaining a permit for construction in the <br /> floodway from the Indiana Department of Natural Resources. Please note that if fill <br /> is needed to elevate an addition above the existing grade, prior approval <br /> (construction in a floodway permit) for the fill is required from the Indiana <br /> Department of Natural Resources.) <br /> 21-12-(e) (5) (B)No action shall be taken by the Floodplain Administrator until a permit <br /> (when applicable) has been issued by the Indiana Department of Natural Resources <br /> granting approval for construction in the floodway. Once a permit for construction <br /> in a floodway has been issued by the Indiana Department of Natural Resources, the <br /> Floodplain Administrator may issue the local Floodplain Development Permit, <br /> provided the provisions contained in Section 21-12 (e) of this ordinance have been <br /> met. The Floodplain Development Permit cannot be less restrictive than the permit <br /> for construction in a floodway issued by the Indiana Department of Natural <br /> Resources. However, a community's more restrictive regulations (if any) shall <br /> take precedence. <br /> 21-12 (e) (5) (6) Standards for ldentified Fringe. <br /> If the site is located in an identified fringe, then the Floodplain Administrator may <br /> issue the local Floodplain Development Permit provided the provisions contained in <br /> Page 4 of 6 <br />