My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10072-11 Amend Code- Ch.21 Zoning, Article 12, Floodplain Regulations ref:10037-10
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
2011
>
10072-11 Amend Code- Ch.21 Zoning, Article 12, Floodplain Regulations ref:10037-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2011 3:56:53 PM
Creation date
2/23/2011 3:56:52 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
2/14/2011
Ord-Res Number
10072-11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
s�c uare inch for everv one square foot of enclosed area. The bottom of all such <br /> openi�s shall be no hi�her than one (1 foot above the exterior �rade or the interior <br /> grade immediately beneath each openin� whichever is higher and shall be located <br /> entirelv below the BFE; and, <br /> 21-12 (b) (69) Regulatory flood means the flood having a one percent (1%) chance of <br /> being equaled or,exceeded in any given year, as calculated by a method and <br /> procedure that is acceptable to and approved by the Indiana Department of Natural <br /> Resources and the Federal Emergency Management Agency. The regulatory flood <br /> elevation at any location is as defined in 21-12 (c) � �2,� of this ordinance. The <br /> "Regulatory Flood" is also known by the term "Base Flood", "One-Percent Annual <br /> Chance Flood", and"100-Year Flood". <br /> 21-12 (c) (9) Penalties for Violation. <br /> Failure to obtain a Floodplain Development Permit in the SFHA or failure to <br /> comply with the requirements of a Floodplain Development Permit or conditions <br /> of a variance shall be deemed to be a violation of this ordinance. All violations <br /> shall be considered a common nuisance and be treated as such in accordance with <br /> the provisions of the Zoning Code for South Bend, Indiana. All violations shall <br /> be punishable by a fine ri^+ °°^°°�';��-: See Section 21-10(h) Enforcement- Fines <br /> for a schedule of fines. <br /> 21-12 (d) (2) (A) vii. Description of the extent to which any watercourse will be altered <br /> or�ek�ec�relocated as a result of proposed development, and; <br /> 21-12 (d) (3) (C) Ensure that construction authorization has been granted by the Indiana <br /> Department of Natural Resources for all development projects subject to �ec�e� <br /> �°� �c� ��a �°� ��� �^� Section 21-12(e�(5) and Section 21-12(e)L2A) of this <br /> ordinance, and maintain a record of such authorization (either copy of actual <br /> permit or floodplain analysis/regulatory assessment.) <br /> 21-12 (d) (3) (I) Verify and record the actual elevation of the lowest floor (including <br /> basement) of all new or substantially improved structures, in accordance with <br /> Section 21-12 (d) (2); <br /> 21-12 (d) (3) (J) Verify and record the actual elevation to which any new or substantially <br /> improved structures have been floodproofed, in accordance with Section 21-12 <br /> (d) �2); <br /> 21-12 (e) (1) (E) Electrical, heating, ventilation, plumbing, air conditioning equipment, <br /> utility meters, and other service facilities shall be located at/above the FPG or <br /> designed so as to prevent water from entering or accumulating within the <br /> components below the FPG. Water and sewer pipes, electrical and telephone <br /> lines, submersible pumps, and other waterproofed service facilities may be <br /> located below the FPG; <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.