Laserfiche WebLink
Als. Sue Ellen Doadnck <br />Jrrly 3, 2018 <br />Project lies under the O1—M!M of the St. Joseph River, and within its flood plain. Because of this the following <br />permits will be required. <br />• US Army Corps of Engineers 404 permit <br />• IDEM Water Quality =101 permit <br />• IDNR Construction in a Ploodway permit <br />UOlies• <br />Utility impacts and coordination are not anticipated, <br />Maintenance of Traffic: <br />A maintenance of traffic plan is not anticipated <br />Right-of-1! u: <br />Right -of -Way acquisition is not anticipated. <br />Geotechnical Investi ation: <br />A Geotechnical Investigation is not anticipated. <br />Project Development Process: <br />Based on our experience with projects of similar size and scope and our discussions with your office the following <br />milestones will be included in the scope of work. <br />• Construction Documents <br />• Bid Phase Services <br />• Construction Administration <br />Scope of Services: <br />The attached man-hour justification (Exhibit A) provides more definition for the scope of design set -vices, Work <br />included herein (including by not limited to, improvements to facilities outside the scope of design services as <br />defined above, etc.) is considered supplemental and will be performed on the negotiated hourly rates as authorized <br />by the City. It is our understanding that the City will provide the following services, if required. <br />• Dye testing <br />Fees <br />Tasks — Lump Sum <br />Amount <br />Task #1: East Bank Rivertvalk* <br />$10,267 <br />Task #2: East Race <br />$18,935 <br />Sub -Total <br />$29,202 <br />Tasks - Hourly Not to Exceed <br />Amount <br />Construction Administration <br />$5,000 <br />Total <br />$34,202 <br />*Work completed by <br />Page 3 troyergrotAp,corn Together, We Will ��: <br />