My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06122018 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2018
>
06122018 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:27:34 PM
Creation date
6/26/2018 12:45:06 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING JUNE 12, 2018 175 <br />Non -Collusion, Non -Discrimination Affidavit was submitted <br />Five percent (5%) Bid Bond was submitted <br />BID: <br />Total Amount of Base Bid (Items 1 through 92) $1,146,533.01 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were <br />referred to Community Investment and Engineering for review and recommendation. <br />OPENING OF BIDS — VENUES PARKS AND ARTS MAINTENANCE STORAGE <br />BUILDING (PARK BOND SERIES I) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. The following bids were opened and publicly read: <br />BROWN & BROWN GENERAL CONTRACTORS INC. <br />124 S. Elkhart St. <br />P.O. Box 487 <br />Wakarusa, IN 46573 <br />Bid was signed by: Eric Brown <br />Non -Collusion, Non -Discrimination Affidavit was submitted <br />Five percent (5%) Bid Bond was submitted <br />BID: <br />Base Bid Total $391,798.00 <br />Alternate #1 Total $132,889.00 <br />R. YODER CONSTRUCTION, INC <br />P. O. Box 69 <br />Nappanee, IN 46550 <br />Bid was signed by: Randall E. Yoder <br />Non -Collusion, Non -Discrimination Affidavit was submitted <br />Five percent (5%) Bid Bond was submitted <br />:G <br />Base Bid Total $483,985.00 <br />Alternate #1 Total $130,960.00 <br />LARSON DANIELSON CONSTRUCTION COMPANY INC. <br />302 Tyler Street <br />LaPorte, IN 46350 <br />Bid was signed by: Timothy F. Larson <br />Non -Collusion, Non -Discrimination Affidavit was submitted <br />Five percent (5%) Bid Bond was submitted <br />BID: <br />Base Bid Total $384,968 <br />Alternate #1 Total $109,894 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were <br />referred to Engineering and Venues, Parks, and Arts for review and recommendation. <br />OPENING AND AWARD OF QUOTATIONS — APS INSTALLATION AT LINCOLN WAY <br />WEST AND CUSHING STREET (LRSA) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The following Quotations were opened and read: <br />
The URL can be used to link to this page
Your browser does not support the video tag.