Laserfiche WebLink
• Details (1 of 2) <br />• Details (2 of 2) <br />Instrumentation <br />• Instrumentation Abbreviations, Legends and General Notes <br />• Control Block Diagram — Compressor Building <br />• Details <br />Contract Documents will be reviewed by senior engineers for quality assurance. The review <br />will cover conformance to standards, completeness, adherence to sound engineering practices, <br />and constructability. <br />Deliverables for the project include: <br />Basis of Design Memorandum Deliverable <br />• Draft Basis of Design Memorandum <br />• Preliminary Opinion of Probable Construction Cost <br />50 Percent Design Deliverable <br />• Final Basis of Design Memorandum <br />• Preliminary Construction Sequencing Plan <br />• Civil Plans, Sections and Details <br />• Structural Plans, Sections and Details <br />• Electrical Site, Power Plan and One -Line Diagrams <br />• Instrumentation Diagrams <br />• Technical Specifications including concrete, electrical, instrumentation and functional <br />description <br />• Preliminary Opinion of Probable Construction Cost <br />90 Percent Design Deliverable <br />• Construction Sequencing Plan <br />• Civil Plans, Sections and Details <br />• Structural Plans, Sections and Details <br />Page 6 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Behveen owner and Engineer for Professional Services <br />Copyright© 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />