Laserfiche WebLink
214 <br />Th,e following report was received from the City Civil Engineer. <br />To the Hon. Board of Public Works <br />of the City of South Bend, Indiana. <br />Ge ntleraen: - <br />Regarding the attached petition for a sewer on Penniylvana A venue from <br />High St. to Miami Street. I recommend that the petition be placed on file. <br />All the property on Pennsylvania Ave. I between High St. and Miami,Street <br />can be accommodated with sewerage without a sewer on Pennsylvania Avenue* <br />Very respectfully, <br />VIM. S. MOORE <br />CITY ENGINEER. <br />,%Petition received from the property holders on Orange Street -from Sadie St. <br />to Olive Street, soliciting a grade,, curb and walk on same. The same was read and <br />referred to the City Civil Engineer for investigation* <br />Petition received for a pipe sewer on..Tecumseh Avenue from Parkovash Ave. <br />to Pokagon Street. The sewer to serve only the lots on the east side and need to <br />be only below the line of first drains, 'should. also be constructed to catch the water <br />at two or three points along the side hill vdth drain behind ttie walk. The same <br />was read and a resolution was ordered prepared and.set for a hearing. <br />To the Hen. Board of Public Works, <br />of the City of South Bend, Indii6na. <br />Gentlemen:- <br />Regarding the attached petition of Geo. H. <br />g <br />on Vassar Avenue from Portage Ave. to Riversid6 Drives <br />be granted. <br />Cregier and others for a sewer <br />I recommend that the petition <br />Very respectfully, <br />WM. S. Moore, <br />City Engineer. <br />The Clerk was instructed to prepare resolution for abov6 improvement and set for a <br />hearing. <br />Excavation bond for the sum of One Thousand ($12000.00)Dollars signed <br />by Aslin Plumbing Co.,, as pr-inciapl and John H. Mitchell & John Y. Slick.Jr. <br />as sureties was approved by the Board. <br />Excavation bond for the sun of One Thousand ($12000.00)Doliars signed <br />by Arthur V. Meyer as principal and The Illinois Surety Co. of Chicago, Illinois <br />as. sureties, was approved by the Board. <br />Excavation bond for the sum of One Thousand ($12000.00)Dollars signed by <br />Jacob M. Single- as principal and Frank J. Singler, Chas. E. Singler as sureties, <br />was approved by the Board. <br />Bond and contract signed by Matthius Feser as principal and Globe Indemnity <br />Company of New York as sureties for the improvement of Grade, curb and walk on Dale <br />Avenue from Dayton Street to Bovman Street, under ImprovementResolutionNo. 294. <br />was approved by the Board. <br />Bond and contract signed by Matthius Feser as principal and The Globe <br />Indemnity Company of New York as sureties, for the #qprovement of Various Streets <br />in the, City of South Bend, Indiana , Under improvement Resolution No. 294. was <br />approved by the Board. <br />Contractors bond for the sum of One Thousand ($17000.00)Dollars signed <br />by Matthius Feser as principal and Globe Indmenity �Company of New York as sureties <br />was. approved, by the Board. <br />Permission was granted the Indiana & Michigan Electric Company to set p-oles <br />as follows: - <br />To reset 5 -351 poles on Leer Street, north of Calvert Street, on the east <br />side of Leer Street2 also 4-a-35t poles on Calvert Street east of Leer Street, to be <br />placed on south side of Calvert Street. <br />