My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec R -One or More 2018 or Newer Combination Jet Rodder-Vacuum Machine with Cab and Chassis - Jack Doheny Companies Part 1
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Spec R -One or More 2018 or Newer Combination Jet Rodder-Vacuum Machine with Cab and Chassis - Jack Doheny Companies Part 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 11:46:40 AM
Creation date
6/13/2018 10:29:16 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12 volt system with plug in at the operators station. <br />Maintenance: <br />All bearings, bushings, pivot points and boom to be greastedYES <br />0 <br />by the operator from ground level. <br />Mounting: <br />Unit bid will be mounted on an approved truck chassis at the <br />0 <br />factory of the body manufacturer. Shall include a toot box as <br />specified by the City, located behind the cab, 48" long x 22" <br />deep, lop$ tall, with a 24" long x 22" deep 10" tall box on top. <br />Both shall have fold down doors. <br />Parts & <br />Due to the type of work this equipment will perform, down <br />(=O <br />Service: <br />time must be kept to a minimum. Accordingly, parts and <br />service must be available as listed below: <br />Parts must be shipped within 48 hours of notification <br />(excluding weekends and holidays) or they are not charged <br />to the City. <br />Service and repair at the City's facilities from the <br />manufacturer must be available within twenty-four (24) <br />hours of notification to the manufacturer, excluding <br />weekends and holiday. <br />Factory authorized service location with stock parts must be <br />provided by the manufacturer. <br />Two copies each of operational, parts and repair manuals <br />shall be provided. Any available technical date sheets shall <br />also be provided, and two sets of line tickets shall be <br />furnished on the truck. <br />Safety: <br />Operator station dB level not to exceed 90 dB. Unit to <br />f 7777 1 q o <br />include safety cone holder. <br />Warranties: <br />The equipment furnished pursuant to these specifications <br />[YES/FO <br />shall be warranted by the manufacturer as follow: <br />All equipment supplied by the bidder, whether or not <br />manufactured by the bidder, will be warranted by the bidder <br />for a minimum of one (1) year from the date of acceptance <br />after delivery. <br />The positive displacement blower shall be warranted for a <br />period of five (5) years. <br />Ver, 2 — March 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.