My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec R -One or More 2018 or Newer Combination Jet Rodder-Vacuum Machine with Cab and Chassis - Best Equipment Co
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Spec R -One or More 2018 or Newer Combination Jet Rodder-Vacuum Machine with Cab and Chassis - Best Equipment Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 11:46:21 AM
Creation date
6/13/2018 10:28:11 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
without water for 10 minutes. A certification by the original <br />water pump manufacturer to operate in such a manner shall <br />be provided. <br />The water pump shall be capable of maximum water <br />pressure and flow while achieving maximum vacuum <br />pressure. 'The water pump shall operate independent of <br />vacuum system. Pump flow must be capable of being turned <br />off at maximum operating RPM and PSI without doing harm <br />to components. <br />A heat exchanger will be provided in the water system to <br />cool all hydraulic fluids on the unit, if required. <br />A monitor light shall be provided to indicate when designed <br />flow or pressure is exceeded. <br />Variable flow valve to adjust water flow without changing <br />engine RPM to be included. <br />The water system shall be designed to enable the operator to <br />turn water flow on/off at maximum psi and rpm without <br />doing harm to components. <br />Cold Weather <br />The system shall incorporate both a cold weather <br />�So <br />Protection: <br />recirculation system and an air purge system. <br />Low point drains shall be included throughout the water <br />system for complete cold weather draining. <br />Rotation Hose <br />The hose reel assembly shall be state of the art design. <br />gSO <br />Reel: <br />The hose reel shall be mounted to assure adequate ground <br />clearance. <br />The hose reel capacity shall have a minimum 800' capacity of <br />I" I.D. sewer hose (2500 psi operating pressure; 7500 psi <br />burst pressure). <br />A 20' leader hose shall be supplied. <br />The hose reel shall be on the front of the truck along the <br />center line axis of the truck with the reel in its fixed <br />position. <br />Ver. 2 — March 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.