My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec R -One or More 2018 or Newer Combination Jet Rodder-Vacuum Machine with Cab and Chassis - 502 Equipment
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Spec R -One or More 2018 or Newer Combination Jet Rodder-Vacuum Machine with Cab and Chassis - 502 Equipment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 11:45:56 AM
Creation date
6/13/2018 10:26:52 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The debris tank shall have a minimum of ten year non pro -rated <br />warranty. Warranty must cover materials, workmanship, and <br />rust through. <br />Water Tanks: <br />Water tanks must have a minimum metered capacity of 1,500 <br />YESCO_�) <br />gallons. <br />The fill system shall include an air gap anti -siphon design to <br />protect the water supply. <br />Water level gauge/tube shall be located at the operator's station <br />and fill station. <br />A 2 Y2" diameter x 25' long hydrant hose, with proper <br />connections, shall be included. <br />A continuous fill system shall be provided so that the unit may <br />be hooked directly to a hydrant. <br />The water tank shall come supplied with a "Y" pattern stainless <br />steel strainer to filter the water before it enters the tank. <br />The water tank shall carry a lifetime warranty against corrosion <br />or cracking. <br />The water supply to the pump shall allow dumping of the <br />debris tank and operation of the water pump while in the full <br />dumped position. <br />Vacuum <br />Dual stage centrifugal compressors capable of 0-8000 elm. <br />YESkq <br />System: <br />Both vacuum and rodder system shall be driven from chassis <br />engine, single engine designed. Units using two engines are <br />not preferred. f Ib Kq&oee, 12 -&, �06 <br />L", <br />Three (3) vacuum relief valves shall be built into the vacuum <br />system to maintain high negative pressure. <br />Air vacuum system shall have an air actuated vacuum relief <br />valve that allows vacuum relief at suction tub while <br />maintaining free air flow through the positive displacement <br />vacuum pump. <br />The positive displacement blower shall carry a five (5) year <br />manufacturer's warranty. <br />Engagement and disengagement of the air vac system shall be <br />vz� <br />performed at the operator's station and/or from inside the cab. <br />One vertically mounted stainless steel micro -strainer in a <br />Ver. 2 — March 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.