Laserfiche WebLink
... ..... .. .... .. . <br />The debris body shall be fixed on an independent frame, <br />separate from the chassis frame and mounted via a 3 point <br />mounting system to allow flexing to occur without causing <br />frame damage. <br />The rear tank shall have a minimum. 5" diameter liquid drain <br />with bronze gate valve which may be located on the rear door. <br />Drain will have a minimum of 15' of lay flat hose. State height <br />of decant drain opening. <br />A decant system shall be provided that assures 80% of debris <br />tank liquids are drained off while on the street. <br />The rear door shall have a decant screen to aid in the decanting v---- <br />process. <br />For the safety of the operator and to eliminate the possibility of <br />the debris tank coming into contact with tree limbs and <br />electrical power lines, under no circumstances shall the debris <br />body elevate during the decant process. <br />For the safety of the operator and to increase productivity, the <br />decant process must occur at the operator's station and shall not <br />require the operator to leave his station to relocate or reposition <br />the truck. <br />Debris body shall be supplied with a bolt on spill shield that is <br />easily removed for cleaning. Shield will be a minimum 12" on <br />bottom half to keep debris away from the rear of the machine, <br />including the rear bumper assembly and water tanks. Body to <br />be painted green to match existing fleet. <br />A manual tank body prop shall be provided. Installation of <br />prop shall be accomplished from the side of the chassis. Units <br />requiring the operator to position themselves under a raised <br />body will not be accepted. <br />An automatic stainless steel ball(s) check valve shall be <br />installed inside the debris body to prevent over filling. When <br />the debris tank is full, the device shall automatically stop the <br />flow of the air to the vacuum system and prevent water and <br />debris from entering the positive displacement vacuum pump. <br />The unit must be able to safely dump the complete load of <br />debris with a full tank of water. <br />The air drawn from the debris body must pass through a filter <br />system of adequate size to protect the vacuum system. The <br />system must be easily cleaned and maintained from the ground <br />level without putting the operator in harm's.way. <br />Ver. 2 — March 2018 <br />be're/k ( <br />in <br />PICC^ <br />