Laserfiche WebLink
REGULAR MEETING MAY 8, 2018 141 <br />AWARD BID — WASTEWATER TREATMENT PLANT BELT FILTER PRESS NO. 1 <br />REHABILITATION — PROJECT NO. 118-019 (UTILITIES, WASTEWATER, OTHER <br />EQUIPMENT) <br />Mr. Jacob Klosinski, Utilities, advised the Board that on April 24, 2018, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Klosinski <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Alfa Laval, Inc., 10470 Deer Trail Drive, Houston, TX 77038 in the amount not to exceed <br />$203,131. Therefore, Ms. Dorau made a motion that the recommendation be accepted and the bid <br />be awarded as outlined above. Mr. Mueller seconded the motion, which carried. <br />AWARD BID — ONE (1) OR MORE, 2018 OR NEWER, TRASH TOTE CLEANING <br />TRAILER SYSTEM — SPEC M (SOLID WASTE CAPITAL LEASE) <br />Mr. Jeff Hudak, Central Services, advised the Board that on April 24, 2018, bids were received <br />and opened for the above referenced equipment. After reviewing those bids, Mr. Hudak <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Hydro -Chem Systems, Inc., 6605 Broadmoor Ave SE, Caledonia, MI 49316 in the amount not to <br />exceed $69,890. Therefore, Ms. Dorau made a motion that the recommendation be accepted and <br />the bid be awarded as outlined above. Mr. Mueller seconded the motion, which carried. <br />AWARD QUOTATION — WEST RACE EMERGENCY REPAIR— PROJECT NO. 115-115 <br />(HOTEL/MOTEL TAX) <br />Ms. Sue Ellen Doudrick, Engineering, advised the Board that on May 3, 2018, one (1) quotation <br />was received and opened for the above referenced project. After reviewing the quotation, Ms. <br />Doudrick recommended that the Board award the contract to the sole responsive and responsible <br />bidder, HRP Construction, Inc., 5777 Cleveland Road, PO Box 266, South Bend, IN 46624, in <br />the amount of $84,100 for the Base Bid plus Alternate B. Therefore, Ms. Dorau made a motion <br />that the recommendation be accepted and the quotation be awarded as outlined above. Mr. <br />Mueller seconded the motion, which carried. <br />APPROVE CHANGE ORDER NO. 1 — CENTURY CENTER VESTIBULE HEATER <br />REPLACEMENT — PROJECT NO. 117-044 (HOTEL/MOTEL TAX) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br />of Edward J. White, Inc., 1011 S. Michigan Street, South Bend, IN 46601, indicating the contract <br />amount be increased by $1,945.74 for a modified contract sum, including this Change Order, in <br />the amount of $34,150.74. Upon a motion made by Ms. Dorau, seconded by Mr. Mueller and <br />carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 3 (FINAL) AND PROJECT COMPLETION AFFIDAVIT <br />— EDISON AND IRONWOOD ROAD CORRIDOR REHABILITATION — PROJECT NO. <br />116-070 LOCAL ROAD AND BRIDGE MATCHING GRANT) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 3 (Final) on <br />behalf of Rieth-Riley Construction Co., Inc. indicating the contract amount be decreased by <br />$91,376.34 for anew contract sum, including this Change Order, of $1,330,517.10. Additionally <br />submitted was the Project Completion Affidavit indicating this new final cost of $1,330,517.10. <br />Upon a motion made by Ms. Dorau, seconded by Mr. Mueller and carried, Change Order No. 3 <br />(Final) and the Project Completion Affidavit were approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — 2017 ENGINEERING REMODEL — <br />PROJECT NO. 117-116 (BUILDING AND STREET MAINTENANCE) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion <br />Affidavit on behalf of Ziolkowski Construction, Inc., 4050 Ralph Jones Dr., South Bend, IN <br />46628, for the above referenced project, indicating a final cost of $13,392. Upon a motion made <br />by Ms. Dorau, seconded by Mr. Mueller and carried, the Project Completion Affidavit was <br />approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — CENTURY CENTER COOLING <br />TOWER REPLACEMENT —PROJECT NO. 117-035 (HOTEL/MOTEL TAX) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion <br />Affidavit on behalf of Edward J. White, Inc., 1011 S. Michigan St., South Bend, IN 46601, for <br />the above referenced project, indicating a final cost of $226,631. Upon a motion made by Ms. <br />Dorau, seconded by Mr. Mueller and carried, the Project Completion Affidavit was approved. <br />