Laserfiche WebLink
41 <br />SIDEWALK, PCCP, 4 IN (+/- 320 SIDEWALK) <br />185 <br />SYD <br />jo, qgq.,,5b <br />42 <br />COMPACTED AGGREGATE, NO 53 <br />24 <br />TON <br />AOD-OD <br />q, RM-e)t) <br />43 <br />BACKFILL <br />12 <br />CYD <br />44 <br />TOPSOIL <br />12 <br />CYD <br />Ile). 0o <br />Wo. 00 <br />45 <br />GRASS SEED <br />220 <br />SYD <br />Qa <br />46 <br />TEMPORARY EROSION CONTROL <br />I <br />LS <br />DIVISION 3 SUBTOTAL <br />f '73 <br />MOBILIZATION AND DEMOBILIZATION (5% MAX) <br />600-00 <br />DIVISION 3 TOTAL <br />139. q I <br />OVERALL PROJECT TOTAL (3 DIVISIONS) <br />1, 0,21. L <br />Bidder (Firm): HRP CONSTRUCTION INC. <br />Address: 5777 Cleveland Road, P.O. Box 266 <br />City/State/Zip: South Bend, IN 46624Telephone Number: ( 574 ) _271-780j��, <br />011 <br />By <br />(Signature) <br />Matthew D. Cain, President <br />(Printed Name of Person Signing) <br />Version 10/17/2,017 Contractor's Bid for Pubko Works - 35 <br />