Laserfiche WebLink
22 <br />GRASS SEED <br />50 <br />SYD <br />8, OD <br />y00.00 <br />23 <br />EXCAVATION, COMMON <br />150 <br />CYD <br />66)-OD <br />q, o vp, aD <br />24 <br />SIDEWALK, PCCP, 4 IN (+/- 200 SW, 210 SFT <br />PAD) <br />145 <br />SYD <br />la4. Sb <br />25 <br />COMPACTED AGGREGATE, NO 53 <br />20 <br />TON <br />3co,00 <br />%, aaa.o v <br />26 <br />BACKFILL, TOPSOIL <br />45 <br />CYD <br />g0.00 <br />11900,01) <br />27 <br />GRASS SEED <br />50 <br />SYD <br />g pp <br />yDO.OD <br />28 <br />TEMPORARY EROSION CONTROL <br />I <br />LS <br />DIVISION I SUBTOTAL <br />aC�$3p p <br />MOBILIZATION AND DEMOBILIZATION (5% MAX) <br />I t f ppo.Uo <br />a <br />DIVISION I TOTAL <br />3oq t g3a o1 <br />SIDEWALK DIVISION 2 - APPROX 500 LIFT <br />29 <br />CLEARING AND GRUBBING <br />6000 <br />SIFT <br />I os <br />-iva oo <br />30 <br />CONCRETE SIDEWALK REMOVAL <br />60 <br />SYD <br />lD,OD <br />oT, g00.00 <br />31 <br />EXCAVATION, COMMON <br />40 <br />CYD <br />32 <br />SIDEWALK, PCCP, 4 IN (+/- 500 SIDEWALK) <br />285 <br />SYD <br />Ste. &3 <br />11, IM-65- <br />33 <br />COMPACTED AGGREGATE, NO 53 <br />36 <br />TON <br />apa, 00 <br />7,�oa.00 <br />34 <br />BACKFILL <br />20 <br />CYD <br />119.00 <br />a0O • [�O <br />35 <br />TOPSOIL <br />20 <br />CYD <br />y0.0p <br />g 00. Do <br />36 <br />GRASS SEED <br />350 <br />SYD <br />a 3a <br />I.Q. pp <br />37 <br />TEMPORARY EROSION CONTROL <br />1 <br />LS <br />.01 <br />, <br />DIVISION 2 SUBTOTAL <br />MOBILIZATION AND DEMOBILIZATION (5% MAX) <br />(! -100. Do <br />DIVISION 2 TOTAL <br />34v,951• S <br />SIDEWALK DIVISION 3 - APPROX 320+ LFT <br />38 <br />CLEARING AND GRUBBING <br />3800 <br />SIFT <br />, SO <br />QOp, 00 <br />39 <br />CONCRETE SIDEWALK REMOVAL <br />8 <br />SYD <br />qo. pD <br />-:3a7Q.00 <br />40 <br />EXCAVATION, COMMON <br />32 <br />CYD <br />3S. DO <br />I , 1a0.00 <br />HRP CONSTRUCTION INC. <br />Version 10/17/2017 Contractor's Bid for Public Works - 34 <br />