Laserfiche WebLink
REGULAR MEETING APRIL 24, 2018 122 <br />HRP CONSTRUCTION, INC. <br />5777 Cleveland Road; PO Box 266 <br />South Bend, IN 46624 <br />Quotation was submitted by Matthew D. Cain <br />QUOTATION: $128,000 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above quotation <br />was referred to Engineering for review and recommendation. After reviewing the quotation, Ms. <br />Sue Ellen Doudrick, Engineering, recommended that the Board reject the quote and the project <br />be re -quoted due to being over the budget. Ms. Kara Boyles, City Engineer, noted the quote was <br />more than double the budget. Therefore, Ms. Maradik made a motion that the recommendation <br />be accepted and the quotation be rejected to allow the project to be re -quoted. Ms. Dorau <br />seconded the motion, which carried. <br />OPENING AND AWARD OF QUOTATIONS — KELLY PARK BIKE RACK CONCRETE <br />PAD (PARK BOND <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotation was opened and read: <br />TX CONCRETE <br />24899 Fillmore Rd. <br />South Bend, IN 46619 <br />Quotation was submitted by Jose Lois Quijada <br />QUOTATION: $1,795 <br />The Board noted there were two different amounts on the written amount and the numerical <br />amount. After further review, it was discovered the numerical amount was listed three (3) times. <br />The Board determined the error was in the written portion. Attorney McDaniels stated it <br />appeared to be an administrative error. Upon a motion made by Ms. Maradik, seconded by Ms. <br />Dorau and carried, the above quotation was referred to Venues, Parks, and Arts for review and <br />recommendation. After reviewing the quotation, Mr. Patrick Sherman, VPA, recommended that <br />the Board award the contract to the sole responsive and responsible bidder, TX Concrete, in the <br />amount of $1,795. Therefore, Ms. Maradik made a motion that the recommendation be accepted <br />and the quotation be awarded as outlined above. Ms. Dorau seconded the motion, which carried. <br />OPENING AND AWARD OF QUOTATIONS — 2017 RIVERSIDE SIDEWALK AND <br />DRIVEWAY— PROJECT NO. 118-050 (MVH) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The following Quotations were opened and read: <br />PREMIUM CONCRETE SERVICES, INC. <br />712 Richmond St. <br />Elkhart, IN 46516 <br />Quotation was submitted by Max A. Yeakey <br />QUOTATION: $5,965 <br />TX CONCRETE <br />24899 Fillmore Rd. <br />South Bend, IN 46614 <br />QUOTATION: $2,224.40 <br />Upon a motion made by Ms. Dorau, seconded by Ms. Maradik and carried, the above quotations <br />were referred to Engineering for review and recommendation. After reviewing those quotations, <br />Ms. Amy Kryston, Engineering, recommended that the Board award the contract to the lowest <br />responsive and responsible bidder, TX Concrete, in the amount of $2,224.40. Therefore, Ms. <br />Maradik made a motion that the recommendation be accepted and the quotation be awarded as <br />outlined above. Ms. Dorau seconded the motion, which carried. <br />