Laserfiche WebLink
1) Reviews of site construction will be completed to ensure the Contractor(s) is providing the <br />level of quality that is required for the project; <br />2) It is anticipated that the Engineer will attend one (1) construction meeting every two weeks <br />(I total) during the construction period; <br />3) Based upon the on -site observations and evaluations of the Contractor's Applications for <br />Payment, assistance to the Client will be provided to determine the amounts due to the <br />Contractor; <br />4) The Engineer will provide clarification/interpretations of the Contract Documents if such <br />interpretations are necessary for the proper execution or progress of work; <br />5) The Engineer shall render written recommendations on claims, disputes and other matters in <br />question between the Owner and Contractor relating to the execution or progress of the <br />project as provided by the Contract Documents; <br />6) Review and approve, or take other appropriate action and forward to the Client for final <br />disposition, the Contractor's submittals such as Shop Drawings, Product Data and Samples <br />with respect to Contract Documents produced by the Engineer; <br />7) Prepare responses to Request for Information (RFI) provided by the contractor; <br />8) Prepare Change, Orders for the Owner's approval and execution; <br />9) Provide field reports describing observations, problems and recommended solutions; <br />10) Provide punch lists based on site observations; <br />11) Conduct inspections to determine the date or dates of Substantial Completion and the date <br />of Final Completion; <br />12) Review and approve, or take other appropriate action on, the Contractor's list of items to be <br />completed or corrected. <br />A1.07 Skyway Marquee Sign: <br />The Engineer shall provide the following services for the new Skyway Marquee Sign: <br />Meet with City of South Bend and Century Center staff to discuss the overall design intent <br />for this sign and potential location. <br />2. Review available building as -built drawings to determine nearest power souse and possible <br />electrical runs to the identified location of the sign. In addition, the Engineer will review <br />with the Owner potential data communication feeds to the sign, <br />1 The Engineer will facilitate a meeting with the City of South Bend and Century staff and a <br />sign fabricator representative to discuss potential sign options and costs. <br />4. Upon selecting the type of sign, the Engineer will prepare the necessary Contract <br />Documents and details for bidding purposes. Submittal of these plans for City review will <br />be at a 30%, 60% and 90% completion. <br />5. The Engineer shall prepare a Construction Opinion of Probable Cost and will submit this to <br />the Owner for review and budgeting purposes. <br />PART 2 — ADDITIONAL SERVICES <br />Page 5 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Betiveen Owner and Engineer for Professional Services <br />Copyright @ 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />