My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Jones Petrie Rafinski - Century Center Building Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Jones Petrie Rafinski - Century Center Building Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:29:11 AM
Creation date
4/26/2018 2:15:37 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. Field measure existing storage room for size/height, location of columns, exsiting lights. <br />2, Prepare construction documantes to add newmezzanine storage deck, add new lights at <br />exsiting ceiling as well as new lights under new storage mezzanine. Will need isolated <br />structure and added sprinkler piping/heads on underside. <br />B1.03 A(ItlHcri?dt-ailstea seat t-ivet-s <br />A. Bendix Theatre <br />1. Add handrails to center of steps at seat risers <br />BI.04 Bidding and Negotiation <br />A. Upon receiving the City's approval of the Construction Document and Specifications, the JPR team <br />shall provide the following Bidding and Negotiation services: <br />1) Prepare a Notice to Bidders. <br />2) Address bidder questions and Request for Information. <br />3) Provide design addendurns as necessary. <br />4) The Engineer will attend one (1) prebid and one (1) bid opening meeting. <br />5) Review bids and make recommendations to the Client regarding awarding the project, <br />131,05 Construction Adirdnistra tion: <br />A. Periodic reviews of site construction will be completed to ensure the Contractor(s) is providing the <br />level of quality that is required for the project. It is anticipated that it will take between sixteen <br />months for the project to be completed. The construction administration services will include: <br />1) Reviews of site construction will be completed to ensure the Contractor(s) is providing the <br />level of quality that is required for the project; <br />2) It is anticipated that the Engineer will attend one (1) construction meeting every two weeks <br />(11 total) during the construction period; <br />3) Based upon the on -site observations and evaluations of the Contractor's Applications for <br />Payment, assistance to the Client will be provided to determine the amounts due to the <br />Contractor; <br />4) The Engineer will provide clarification/interpretations of the Contract Documents if such <br />interpretations are necessary for the proper execution or progress of work; <br />5) The Engineer shall render written recommendations on claims, disputes and other matters in <br />question between the Owner and Contractor relating to the execution or progress of the <br />project as provided by the Contract Documents; <br />6) Review and approve, or take other appropriate action and forward to the Client for final <br />disposition, the Contractor's submittals such as Shop Drawings, Product Data and Samples <br />with respect to Contract Documents produced by the Engicer; <br />7) Prepare responses to Request for Information (RFI) provided by the contractor; <br />8) Prepare Change Orders for the Owner's approval and execution; <br />9) Provide field reports describing observations, problems and recommended solutions; <br />10) Provide punch lists based on site observations; <br />Page 2 <br />(Exhibit A — Engineer's Services) <br />E,JCDC E-500 Agreement Between owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. A►ll rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.