My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec L - One or More 2018 or Newer 3 1-2 Ton Utility Truck with Crane - Selking International Trucks
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Spec L - One or More 2018 or Newer 3 1-2 Ton Utility Truck with Crane - Selking International Trucks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 11:42:35 AM
Creation date
4/26/2018 1:45:06 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fffl&'.."i n [)v VV /5, Jc)nes <br />Protective Circuit: Compressor to automatically shut down in. case of high compressor <br />temperature or over pressurization. Additional protective features provided include <br />FX-,]Yes E]No <br />automatic blow down valve, receiver relief valve and minimum pressure valve. <br />Cooling System: Compressor cooling system shall allow rated air delivery and pressure <br />operation continuously in 125 degree Fahrenheit ambient temperatures. Cooler to be mounted <br />in a powder coated sheet metal enclosure with a suction type fan assembly. (No ABS plastic <br />[DYes FNo <br />shrouding) Compressor fluid shall be filtered by a 25 micron full flow spin -on replaceable <br />filter canister. A faii temperature switch shall.be.provid�ed to regulate compressor ��. <br />Controls: Pneumatic inlet control valve shall be integrated into compressor system and <br />FX]YcsE]No <br />automatically modulate output from 0 to 100% in response to air demand <br />Speed Control: Electronic Vanair VJEC engine speed control, <br />[2]Ycs <br />[]No <br />Driveline: 2 V2ineh 1310 series driveline with universal joint, yqlLe and companion flange. <br />[DYesE]No <br />Warranty: Warranty on the combination unit shall be as follows: The air end shall be <br />warranted for life when adhering to the prescribed maintenance schedule. The warranty will <br />ElYes FNo <br />not cover damage caused by accident, misuse, or negligence. If the compressor unit is <br />disassernbled the warranty shall be void. All other parts including thecompressor unit shaft <br />seal are warranted for twelve months subject to the same conditions mentioned above. <br />Service Centers: The air compressor manufacturer MUST have factory authorized <br />E1YcsF]No <br />service centers within 50 miles of the purchaser's garage. <br />Training: There shall be a minimum of 8 hours training provided by the underdeck <br />manufacture upon delivery, such training shall consist of four (4) hours operator and <br />MYesE]No <br />four hours mechanics. <br />Hoses: Unit shall include all hoses, couplings, and fittings for a complete operation. <br />There shall also be included the following hoses: <br />1) A hydraulic hose reel with a minimum of 50 foot pressure and return hose. <br />FX YeSE]No <br />Recl shall be mounted at location of the customers choosing. <br />An air hose reel with a n-rininrum of 50 foot for air lines shall be provided mounted at <br />location of the customers choosing. <br />Hydraulic tool circuit: Tool Circuit: The following specifications describe a hand held <br />hydraulic tool circuit powered off the transmission. Tool circuit shall be provided and <br />installed on the service body. <br />Placement of valve and hose reelshall be determined upon time of installation upon the <br />body by consultation with maintenance personnel. <br />1) Hydraulic: Unit must have three (3) hydraulic tool circuits with minimum <br />capabilities of- <br />FK-IYes MNo <br />Tool circuit #l: 0-10gpin @ 2000 psi <br />Tool circuit #2: 0-10gpm @ 2000 psi <br />Tool circuit #3: 0-1 Ogpm @ 2000 psi <br />All three (3) hydraulic tool circuits can be operated simultaneously for continuous duty <br />use, The hydraulic hose reel and the crane shall be on different circuits. The crane <br />shall be operated off the V3 Generator hydraulic system, <br />Valve: The valve system will include a pressure compensated flow control to adjust the <br />output flow to the tool. Value will include an ori/off lever; flow control knob with <br />numbered detented positions and a relief valve. The valve will be mounted in a location <br />MA, Y c sE]No <br />determined by maintenance personnel at the time of construction. <br />Reservoir: the system will include a 30-gallon oil reservoir installed to permit easy <br />service and maximum ambient cooling, Reservoir will include a cartridge type oil filter <br />FX <br />rated for 50 gpm with a 25-micron element. One extra element to be furnished with the <br />lYesE]No <br />system. <br />Hose Reel: System shall include one heavy-duty hose reel filled with 50' of twin line <br />1/2" hydraulic hose. Reel to feature spring retract and include a rubber stop and two <br />[]Yes E]No <br />HTMA flush face tool couplers, This hose reel shall be on a dedicated tool circuit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.