My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Lawson Fisher Assoc. - Corby, Ironwood, Rockne Intersection
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Amendment No 1 to PSA - Lawson Fisher Assoc. - Corby, Ironwood, Rockne Intersection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:21:29 AM
Creation date
4/26/2018 10:55:24 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract Amendment No. 1 <br />Project: Intersection Improvement, Roundabout <br />Corby Boulevard / Ironwood Drive 1 Rockne Drive <br />Des. No.: 1600074 <br />This Contract Amendment is made and entered to this Contract between the City of South Bend Board of <br />Public Works (hereinafter referred to as "LPA") and Lawson -Fisher Associates P.C. (hereinafter referred to <br />as "CONSULTANT"). <br />WHEREAS, the LPA and CONSULTANT did April 26, 2016 enter into a Contract for project <br />development services for the above reference project. <br />WHEREAS, the LPA desires the CONSULTANT provide additional services to visually verify and <br />horizontally and vertically map existing underground utilities at critical proposed storm sewer crossing <br />locations as indicated in the attached Subsurface Utility Engineering Locations figures; and <br />WHEREAS, in order to provide for completion of the work, it is necessary to amend and supplement <br />the contract in the amount of $24,200.00 <br />NOW, THEREFORE, it is agreed by and between the parties that the following Appendices are <br />amended: <br />Appendix "A" is amended as follows: <br />1. ADD Task 7 — The CONSULTANT shall provide visual verification along with horizontal and <br />vertical mapping of existing underground utilities at critical proposed storm crossing locations. <br />Appendix "C" is amended as follows: <br />All work by the CONSULTANT under this Contract shall be completed and delivered to the LPA for review <br />and approval within the approximate time periods shown in the following submission schedule: <br />8. Right -of -Way Engineering <br />9. Stage 3 Plan Submission <br />10. Real Estate Services <br />11. Final Tracings Submission <br />12. Ready for Contracts <br />Appendix "D" is revised as follows: <br />1 ^'� m24r,T 05/04/18 <br />92121119 10/11 /19 <br />0710611 & 10/11 /19 <br />11 /25/19 <br />12/24/19 <br />A. 1. The consultant shall receive payment for the work performed under this contract the total <br />amount not to exceed is $468,625 $492,825 (Section 2 - $386,700; Section 3 - $61,925; <br />Section 4 - $20,090 $44,200) unless an amendment is executed by the parties which <br />increases the maximum amount payable. <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.